02道路交通试题分类整理06往前(02 classification of road traffic problems 06).docVIP

02道路交通试题分类整理06往前(02 classification of road traffic problems 06).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
02道路交通试题分类整理06往前(02 classification of road traffic problems 06)

02道路交通试题分类整理06往前(02 classification of road traffic problems 06) Road traffic The first road route I. Introduction Characteristics of road transportation and road function General situation of road development at home and abroad Classification of roads In 1995, 1, Chinas urban roads were divided into,,, and, their functions as. In 1997, 2, the urban road traffic planning and design code will be divided into urban roads,,, Four category. Two, road traffic infrastructure: Basic concepts - Design of vehicles, calculation of speed, traffic volume, road section capacity In 1995 1, A road is a pure Road, no intersection, one-way two lane, the measured speed of 40km/h per lane by 1600 /h, while the road B is a motor vehicle and non motor vehicles traveling on the road, crossed the way to split the lane, one-way three lane (including two for motor lane, a non motorized vehicles), a plane intersection (both red and green light time in half), measured the vehicle speed is 18 km/h, the vehicle two lane capacity of less than 1600 /h, the basic theory and knowledge with the comprehensive calculation and analysis (known car 5 meters long the driver reaction time of 0.7 seconds, the road flat slope, road friction coefficient and other self coefficient). In 1997, 1, the capacity of a lane is the value of the length of the vehicle being removed per unit time. 2, traffic planning to predict the amount of traffic on the road network using four steps,, ,. 4, traffic density: 2000 5, urban transportation mode structure: 2003 6, road service level: In 2004, 7, a bicycle lane capacity, density for. 8, road service level: 2005 9, the design speed of the road: 10 、 traffic planning usually through,,, Four steps are carried out for traffic prediction. 11, the main factors affecting road capacity include. 12, the survey found that a road vehicle running very fast, the traffic through the road is also very large? Please explain the reason. In 2006, 13, a city road car speed is very fast, that c

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档