- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
C段地图和流程图范文
地图:The two figures demonstrate the estimated changes of a college between 2014 and 2015.At present, a garden lies in the northern part of the college and five car parks are located in the west. Both of them are linked to the school building by a footpath, while its entrance is in front of the garden. Inside the building, a lunch area and two classrooms lie in the western side, while one more classroom, a reception and a library are in the eastern part. For the southern edge, there is a toilet in the middle, and a bus stop on the southwestern corner, accessed by a road.In 2015, several changes are expected to be witnessed. The garden and the footpath will be removed, since the teaching building will be extended. A new shop will be established in the building’s northwestern corner, and the library will be moved to the southwestern end. Between them, there will be the original lunch area and one classroom, while other four classrooms will be seen in the opposite side. The entrance will be rebuilt in the middle southern edge, adjacent to the bus stop, and the corridor behind it will be replaced by a reception.To summarize, more rooms and car parks will be constructed in the college during the period.C8T3流程图The?two?diagrams?show?how?cement?and?concrete?are?produced?with?different?materials?and?facilities?used.At?the?first?stage,?limestone?and?clay?are?crushed?by?the?crusher?intoPowder?.The?powder?is?then?delivered?to?the?mixer,?where?it?is?mixed.?The?mixture?is?subsequently?sent?to?the?rotating?heater,?after?which?it?is?heated?and?rotated.?In?the?next?step,?the?rotated?powder?is?placed?on?the?conveyor?belt,?before?being?ground?by?the?grinder?into?cement.?This?final?product?is?packed?in?bags.In?the?process?of?the?concrete?production,?gravel?accounts?for?50%?ofmaterials,?while?cement,?water?and?sand?represent?15%,10%?and?25%respectively.?These?materials?are?placed?in?the?concrete?mixer,?which?rotates?clockwise?until?concrete?is?produced.To?summarise,?cement?production?cons
您可能关注的文档
- Chp04电子技术电路(模拟部分)康华光版课件第04章.ppt
- CityEngine与ArcGIS对栅格数据的要求情况.docx
- CPM信号结合判决反馈的多分支分数多比特差分检测.pdf
- CPU 313C (6ES7313-5BG04-0AB0) 的操作系统更新.docx
- CRM整体数据框架及数据定义.doc
- CT成像技术概述.ppt
- CT成像原理介绍(英文版).ppt
- CT灌注成像在肿瘤.ppt
- C盘windows下面各个文件夹的含义.docx
- C语言300行 投篮.docx
- 2025年上海惠普有限公司校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版1套.docx
- 2025年中国素色超柔布市场调查研究报告.docx
- 2025年上海振华港口机械股份有限公司校园招聘模拟试题附带答案详解附答案.docx
- 2025年中国糯米丸子市场调查研究报告.docx
- 2025年上海强生集团有限公司校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版及.docx
- 2025年中国索道外抱卡模锻件市场调查研究报告.docx
- 《行动定位服务》课件.ppt
- 2025年上海建工股份有限公司校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版完.docx
- 2025年上海建工股份有限公司校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版含.docx
- 2025年上海惠普有限公司校园招聘模拟试题附带答案详解汇编.docx
文档评论(0)