管道设计6月考试题及答案20080519(Piping design June test questions and answers 20080519).docVIP

管道设计6月考试题及答案20080519(Piping design June test questions and answers 20080519).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
管道设计6月考试题及答案20080519(Piping design June test questions and answers 20080519)

管道设计6月考试题及答Piping design June test questions and answers 23 connecting other professional pipes shall indicate where to go and cut off with a double point line. Connect the other piping. The floor plan shall be marked with COD 1705II-670/, -045, and the boundary area shall be marked B.L. The reflux opening of the 24 column is generally arranged on the pipe side above the tower plate, and the internal structure and the opening position of the return pipe are related to the overflow way of the tray. 25 reboiler vapor return port should be located in the center line of the tower, and is arranged in parallel with the tank. Two multiple-choice questions (each of 1 points to 25 points total) 1. pipe two adjacent weld center spacing for the nominal pipe diameter less than 150mm, A (C) should not be less than the diameter of not less than 50mm; B; C is smaller than the outer diameter, and not less than 50mm; the 2. pipeline two adjacent weld center spacing: the pipeline in nominal diameter is larger than 150mm, A (C) should not be less than the diameter of not less than 50mm; B; C is less than 150mm; 7.1.5 3. GB50016 (C), combustible gas and liquid pipeline is prohibited through the firewall. A a, B, a and B, C, a, B, C; 4., the pipeline across the device maintenance of roads and fire roads, the road above the headroom should not be less than (A). A 4.5m; B 3.5; m; C2.2m; 5. units within the pipe corridor is not installed when the pump or heat exchanger, the pipe bottom to ground clearance height should not be less than (A). A 3M; B 3.5; m; C2.2m; 6.; the pipe laying on the pipe pier or pipe rack shall have a net distance of no less than (B) whether or not there is insulation. A 100mm; B 50; mm; C25mm; 7. The most prominent part of the outer wall of the outer wall of the pipe or pipe insulation; the net distance from the column, frame, column, building wall or trench wall shall not be less than (B). A 150mm; B 100; mm; C200mm; 8 the sampling port of the

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档