A Guide to Performing An Arc Flash Hazard (指南执行电弧闪光危害).pdf

A Guide to Performing An Arc Flash Hazard (指南执行电弧闪光危害).pdf

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
A Guide to Performing An Arc Flash Hazard (指南执行电弧闪光危害)

A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software Abstract : The nature of explosive equipment failures, and the rate of serious burn injuries in the electrical industry has been studied for many years. Detailed investigation into the arc flash phenomena by many researchers has led the NFPA to adopt arc flash guidelines in NFPA-70E (2000) for work on or near energized electrical equipment. The 2002 National Electric Code also adopted Arc Flash Hazard labeling requirements. In September of 2002, IEEE-1584 “IEEE Guide For Performing Arc Flash Hazard Calculations” was released, providing the detailed equations for determining arc flash energies. Proposed NFPA-70E (2003) due for adoption in May 2003 enhances the original 70E guidelines and adopts IEEE-1584 as the basis for determining arc flash energies. Arc-flash hazard studies require knowledge of both the electrical power system in a facility, and the systems electrical protection. Arc flash studies can be considered a continuation of the short circuit and coordination aspects of a power system, since the results for each are required to assess flash hazards. The effort required to perform an arc hazard assessment is greatly reduced the closer the integration between the short circuit, protective device coordination, and the arc-flash software. This paper provides a guideline for performing an arc-hazard assessment using power system analysis software. All references and examples in this paper refer to EasyPower software. In order to minimize space requirements, it will assume the user has the power system modeled in EasyPower, and has performed a short circuit and protective device coordination study. Step-1 Data Collection And System Modeling The greatest single effort in performing an arc-flash study is in data collection. For a system with up to date one-line diagrams, data collection can take from

您可能关注的文档

文档评论(0)

hhuiws1482 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档