- 1、本文档共47页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Initial Essentially uncontrolled Repeatable Product management procedures defined and used Defined Process management procedures and strategies defined and used Managed Quality management strategies defined and used Optimising Process improvement strategies defined and used The SEI capability maturity model Problems with the CMM Practices associated with model levels Companies could be using practices from different levels at the same time but if all practices from a lower level were not used, it was not possible to move beyond that level Discrete rather than continuous Did not recognise distinctions between the top and the bottom of levels Practice-oriented Concerned with how things were done (the practices) rather than the goals to be achieved. The CMMI model An integrated capability model that includes software and systems engineering capability assessment. The model has two instantiations Staged where the model is expressed in terms of capability levels; Continuous where a capability rating is computed. CMMI model components Process areas 24 process areas that are relevant to process capability and improvement are identified. These are organised into 4 groups. Goals Goals are descriptions of desirable organisational states. Each process area has associated goals. Practices Practices are ways of achieving a goal - however, they are advisory and other approaches to achieve the goal may be used. CMMI process areas 1 CMMI process areas 2 CMMI goals CMMI practices CMMI assessment Examines the processes used in an organisation and assesses their maturity in each process area. Based on a 6-point scale: Not performed; Performed; Managed; Defined; Quantitatively managed; Optimizing. The staged CMMI model Comparable with the software CMM. Each maturity level has process areas and goals. For example, the process area associated with the managed level include: Requirements management; Project planning; Project monitoring and control; Supplier agreement management; Measure
文档评论(0)