网站大量收购独家精品文档,联系QQ:2885784924

4 保证安全的技术措施(4 technical measures to ensure safety).doc

4 保证安全的技术措施(4 technical measures to ensure safety).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
4 保证安全的技术措施(4 technical measures to ensure safety) 2 insulated gloves should be worn on high voltage test. Insulated telescopic electroscope rod length should be pulled, electricity grip shall not exceed the retaining ring on the handle should be hand and human should be electricity equipment to maintain the distance specified in table 2-1. No outdoor direct inspection is allowed during rain or snow weather. 4.3.3 for direct electrical inspection equipment, lack of HVDC equipment and sleet weather outdoor equipment, can be carried out by indirect electricity testing, mechanical equipment, electrical position indication, charged display device, instrument and various changes of telemetry information signal to judge. Judge, should have two or more instructions, and all instructions have also occurred in the corresponding change, to confirm that the device has no power; if the remote operation, should also check the isolating switch (switch) status indication, telemetry, remote signals and charged display device instructions for indirect electricity testing. Electrical equipment 330kV and above can be checked by indirect inspection method. The 4.3.4 indicates that the device is disconnected and allows access to the interval signal, often accessed voltmeter, etc. if electrical power is indicated, the device is not allowed to work. ********4.4 grounding. 4.4.l the grounding wire shall be installed by two persons (except for the items approved by the approval of a single grounding line and the operator). 4.4.2 equipment have no voltage when verifying, should immediately repair the equipment grounding and three-phase short circuit. Cable and ground capacitor should be fully discharge by phase, neutral point should be grounded, star connection capacitor series capacitor and capacitor discharge times and one by one the whole group of capacitors should be installed in the insulation detachment, capacitor shell bracket should also discharge. 4.4.3 the grounding wire or earthin

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档