- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
抓好公路路面工程管理与质量管理的体会(Experience of highway pavement management and quality management)
Experience of highway pavement management and quality management
For / Reprint: Zhang Shuanzhu release time: 2004-5-14 browser: 39
With the continuous development of high-grade highway, each contractor in the quality of Engineering competition, to win the quality, reputation in the market, has formed a situation. Highway construction enterprises should be as strong competitors in an invincible position, only by strengthening project management and project quality management, in order to occupy the market in the competition, stand on your feet. Here on the past few years our company road engineering management and engineering quality management practices talk about experience.
- improving the quality assurance system and strengthening the quality inspection methods
In order to do a good job in quality management, our company started from three aspects of organization, personnel and system, and established and improved the quality assurance system. Project manager department chief engineer, responsible for all technical management and quality supervision work, and served as chief engineer; engineering department, responsible for the work of the Department of quality inspection and technical management, quality inspection, measurement and test under three team, specifically responsible for the project quality control, inspection and acceptance of work. Independent testing teams have been set up everywhere, and the proportion of testing staff and construction staff is 1:3 - 1:4. All kinds of personnel in implementation of this type of work post responsibility system strictly, ensure the quality of the system is given from the strict implementation of the company, engineering quality and technical management system), company , monthly quality inspection system of roadbed construction rules , quality veto system and excellent project implementation plan , improve the pavement the quality
您可能关注的文档
- 两个核心价值观念(Two core values).doc
- 两类结构学习资料(Two types of structure learning materials).doc
- 两天一夜(Two days and one night).doc
- 七彩繁殖(Colorful reproduction).doc
- 七大灯具营销观(Seven lamps marketing view).doc
- 七年级历史上册复习卷(Seven grade history book review Vol.).doc
- 七年级人教版下册语文说课稿(Seven grade 2 Chinese people education press releases).doc
- 七年级上册数学复习资料(Review the data of seven grade math).doc
- 七年级下册地理必考(Grade seven geography study).doc
- 七年级语文上册 册第19课《尼斯湖怪被抓住啦》练习 鄂教版(Grade seven Chinese census volume nineteenth class Loch Ness monster caught practice Hubei Education Press).doc
- 总烧行管维修(Total fire line maintenance).doc
- 座便器安装规范及注意事项(Toilet installation specifications and matters needing attention).doc
- 左190自定义模块模板(Left 190 custom module templates).doc
- 跑跑卡丁车道具小技巧(Karting skills).doc
- 跑铅方法(Lead removal method).doc
- 铺设地板方法(Floor laying method).doc
- 齐鲁古代建筑艺术之美(The beauty of ancient architectural art in Qilu).doc
- 铺瓷砖的六种方法(Six methods of tiling).doc
- 起步熄火原因(Starting flameout reasons).doc
- 起居室(The living room).doc
文档评论(0)