提高深井钻井速度的有效技术方法(Effective technical methods for improving drilling speed in deep well).docVIP

  • 2
  • 0
  • 约1.09万字
  • 约 9页
  • 2017-08-03 发布于河南
  • 举报

提高深井钻井速度的有效技术方法(Effective technical methods for improving drilling speed in deep well).doc

提高深井钻井速度的有效技术方法(Effective technical methods for improving drilling speed in deep well) Effective technical methods for improving drilling speed in deep well Abstract: This paper analyzes the main problems existing in deep well drilling, puts forward relevant suggestions, and discusses several drilling technology in deep well drilling, in order to improve its drilling speed and reduce drilling costs. Keywords: deep drilling technology speed The achievement of drilling technology in deep and ultra deep wells is one of the marks of comprehensive drilling technology level in a country. Compared with the advanced level of foreign countries, there is still a big gap between deep drilling and ultra deep drilling technology in china. In order to reduce our country in deep and ultra deep drilling technology in the field of the gap with foreign advanced level, improve our deep and ultra deep well drilling technology, should be aimed at main problems and take relevant measures. First, the problems existing in deep drilling Deep well drilling through multi strata, geological age of more and larger changes across these strata, geological conditions of the same section may be perplexing, including the pressure gradient is large and complex formation pressure system formation, the construction of a well to the prevention and treatment of several different kinds of complex underground. Coupled with the deep strata, high temperature, high pressure, high layer stress, etc., will make the complexity of the underground complex and difficult to deal with complex greatly increased. As far as Chinas drilling technology is concerned, the technical problems existing in drilling deep wells are mainly as follows: 1., the main drilling equipment performance is poor, relatively old, and compared with foreign advanced equipment, too far behind. 2., it is a difficult problem to raise drilling speed for large size, well bore and deep well section. Drilling rate of deep hole in slim hole at 3. mult

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档