- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
箱梁吊装方案设计和安装方案(Box girder lifting scheme design and installation program)
Abstract: Suqian Xinyi River Bridge with two short bridge, prestressed composite box beam prefabricated hoisting line, the cost increase, we must optimize the lifting scheme. In this paper, the determination and design of hoisting scheme, the installation steps and attentions of box girder are expounded in detail.
Key words: bridge box girder hoisting design installation
Suqian City Xinyi River Bridge is located in the north of the new road is connected with the host, Xinyi City, Suqian City, the north is the main export. The upper structure form is: 1~4 holes and 15~18 holes are 25m prestressed composite box girders, and 5~14 holes are 30m prestressed composite box girders. The whole bridge is prefabricated with 25m beams 64 pieces and 30m beams 80 pieces.
1 Determination of hoisting scheme
Because of the bridge south of Suyu County, north of Xinyi city tree village, village, two short bridge approach, no suitable venue for line prefabrication, must be prefabricated online, making the installation cost increase, so it is necessary to optimize the design installation scheme.
A program application is more: the box out of the pit will be moved to Longmen Longmen bridge girder, installation under 1 ~ 4 hole cross bridge with two span bridge in Longmen, the installation of 5 ~ 18 hole box girder, with a pit of Longmen Longmen bridge cross beam moving, the beam to approach. Then use the double guide Liang Zhukong installation. The scheme has a clear division of labor between the Longmen and the guiding beam, and the workers are easy to operate. But because of the bridge deck from prefabricated field ground height is high, which makes the two span bridge in Longmen is relatively large, and there is still the possibility of instability, and needed more equipment and materials, high construction cost, must be improved. Through research, the method of increasing temporary piers can cancel the cross brid
您可能关注的文档
- 绿化防护措施(Greening protection measures).doc
- 绿化资料(Greening data).doc
- 绿柳才黄半未均(Green willow only yellow, half uneven).doc
- 绿色贸易壁垒对我国纺织品服装出口的影响及对策(The influence of green trade barrier on China's textile and garment export and the Countermeasures).doc
- 绿野活动定级户外线路强度标准(Green activity grading outdoor line strength standard).doc
- 美 日 中地方税制比较(Comparison of local tax system in America and Japan).doc
- 美发理论知识(Hairdressing theory knowledge).doc
- 美国的警车私用制度(Police car private system in the United States).doc
- 美国宝宝—中国旅行证(American baby - China Travel Permit).doc
- 绿能草根到伟大的美丽蜕变管理(Green the grassroots to the management of great beauty transformation).doc
原创力文档


文档评论(0)