预算项目中容易遗忘的项目统计(免费分享)(Project statistics that are easy to forget in budget projects (free sharing)).docVIP

  • 1
  • 0
  • 约1.11万字
  • 约 12页
  • 2017-08-03 发布于河南
  • 举报

预算项目中容易遗忘的项目统计(免费分享)(Project statistics that are easy to forget in budget projects (free sharing)).doc

预算项目中容易遗忘的项目统计(免费分享)(Project statistics that are easy to forget in budget projects (free sharing)) Budget members often easily miss projects that are summarized 1. Earthwork engineering 1. It is easy to miss the coefficient of single side abandoned soil of trench soil; 2. The artificial coefficient of the outer soil is forgotten; 3, in excavation engineering, and now the valuation table, dig the wet earth fee is not included in the pumping (norm is included), now in the measures in the project, construction drainage, precipitation, namely chapter 21 in deep foundation pit supporting chapter. W