- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
车号员1(Car number part 1)
Why is the station technical process to be developed?
Answer: because the station technology process is the work station traffic rules one of the main component, which is an important technical documents of daily production activities guidance station, which is the important basis of traffic command work. In order to ensure the safety and quality of stations, the process of technical operation must be prepared. 2.
What is the process of freight train technology?
The technical operation process of the freight train is the technical operation and time standard of various freight trains on the arrival line of the station. 5.
What is train technology?
Answer: the train station, at the end of the station and the technical station on the way of the train, on the arrival of the line of work on the train, called the train technical operation. 1.
What is truck technology?
Answer: when the truck arrives at the station, it will stop at the station, and the work done at the station will be called the technical work of the lorry. 1.
What are the technical points of the technical station?
Answer: technology stand for train operation types are: (1), (1) initial marshaling work not adjustable transit train operation part, (1) based on transit train operation and reached the collapse of the train operation. 1.
What are the contents of the train technical operation?
(1) maintenance of vehicle technology; 1.
(2) cargo inspection and consolidation; 1.
(3) check and check the car number; 1.
(4) handover of car and ticket; 1.
(5) change of locomotive; (6) the driver. 1.
What is no adaptation (no transfer) transfer train? What technical projects does it have at the technology station?
Answer: technical station, only to go through necessary transit operations continue to run after the train for adaptation (not adjustable) transit train, no 1) technology
您可能关注的文档
- 钢质栏杆技术标准((Steel rail technical standard ().doc
- 钢筋施工1(Steel reinforcement construction 1).doc
- 钢筋质量通病(Quality of reinforcing bars).doc
- 钢中缺陷的超声波定性探伤(Ultrasonic testing of defects in steel).doc
- 锅炉安装工艺标准(2005新版)(Boiler installation process standard (new edition 2005)).doc
- 锅炉名词解释总结(Boiler noun explanation summary).doc
- 锅炉参考文献(Boiler reference).doc
- 锅炉膜式管屏制造技术条件(Manufacturing technical conditions of boiler membrane tube).doc
- 锅炉特种人员考模拟题(Boiler special personnel examination simulation problem).doc
- 锅炉应知应会1(The boiler should be known to be 1).doc
- 实验室危废随意倾倒查处规范.ppt
- 实验室危废废液处理设施规范.ppt
- 实验室危废处置应急管理规范.ppt
- 初中地理中考总复习精品教学课件课堂讲本 基础梳理篇 主题10 中国的地理差异 第20课时 中国的地理差异.ppt
- 初中地理中考总复习精品教学课件课堂讲本 基础梳理篇 主题10 中国的地理差异 第21课时 北方地区.ppt
- 危险废物处置人员防护培训办法.ppt
- 危险废物处置隐患排查技术指南.ppt
- 2026部编版小学数学二年级下册期末综合学业能力测试试卷(3套含答案解析).docx
- 危险废物处置违法案例分析汇编.ppt
- 2026部编版小学数学一年级下册期末综合学业能力测试试卷3套精选(含答案解析).docx
最近下载
- 米油调料副食品配送投标方案技术标.docx
- 工艺部门三年工作规划.pptx
- QC成果-提高外墙保温装饰一体板一次施工合格率.docx VIP
- 中国心房颤动管理指南(2025版)解读ppt课件.pptx VIP
- 风电安全文明施工策划.docx
- 管理英语1-国家开放大学电大机考网考题目答案 .pdf VIP
- TS16949:2016中文版(标准-高清).pdf VIP
- 炎德·英才大联考长沙市一中2026届高三月考(五)地理试卷(含答案详解).pdf
- QC成果提高外墙保温装饰一体板一次施工合格率.docx VIP
- 高中英语(新人教版)选择性必修三同步习题:UNIT 1 Part 3(同步习题)【含答案及解析】.pdf VIP
原创力文档


文档评论(0)