三峡三期工程大坝混凝土优质快速施工新技术研究和实践.pdfVIP

  • 1
  • 0
  • 约5.88千字
  • 约 5页
  • 2017-08-04 发布于北京
  • 举报

三峡三期工程大坝混凝土优质快速施工新技术研究和实践.pdf

28 6 Vol . 28 No. 6 2009 12 JOURNAL OF HYDROELECTR C ENG NEER NG Dec. , 2009 杨学红, 范五一, 李 锋 ( , 430010) : , 3m , 2# , , , : ; ; ; ; : TV544 : A Research and practice on new technology of concrete rapid construction in Three Gorges project YANG Xuehong, FAN Wuyi, L Feng ( Changj iang Institute fo Survey , Planning , Design and Research , Changj iang Water Resources Committee , Wuhan 430010) Abstract: Based on the analyses and application of the rapid concrete construction technologies for the second stage, the third stage dam of Three Gorges project adopted a lift thickness 3m for the foundat ion nonrestriction zone, dam temperature compensation for the joint of the grouting compartment of the concrete with short age, and the longitudinal jointfree concrete placing for the No. 2 right nonoverflow dam field. The third stage dam was completed half a year ahead the schedule and no concrete crack appeared. The applicat ion proved that these new technologies of rapid construction are feasible and are valuable to the other projects. Key words: construction of hydraulic engineering; rapid construction; new technology; concrete dam; Three Gorges project 0 , , , , , 185m, 30m, 155m15 ~ 26 , 20 21 , 185m, , 26 , 1 ~ 7 , 3 5 160m, , 2006 12 , 2005 2006 156m 2007 , 2006 6 1850m, , 1 26 4 , 44m , : : ( 1972 ) , , , . Email: Jeans0787@ sina. com 6 : 127 4 25 21 18 15 4 , , ,

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档