网站大量收购独家精品文档,联系QQ:2885784924

100-编号(Number 100 -).doc

  1. 1、本文档共35页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
100-编号(Number 100 -) No. : Building fire service inspection Project profile Engineering name: Authorized unit: (seal) Date of completion: Guangdong construction fire service inspection center co. LTD Company address: second floor, building 2, tianhe sports centre, sports west road, guangzhou Contact number:(line), 21 or 22 Telephone number:and 66th fax number:Said Ming 1. The entrusted unit shall provide the following information: 1. Construction drawing or completion drawings for fire-fighting facilities; 2. Hidden engineering intermediate acceptance records, system test and pressure flushing records, system debugging and measurement records (including loop insulation resistance, grounding resistance, etc.); Code chart or coding diagram for fire alarm system; 4. The fire control facilities inspection before the completion of the acceptance inspection shall provide a copy of the review of the design of fire protection design for the construction project; For the fire protection project filed on the Internet, it is necessary to provide the certificate of acceptance for the construction engineering fire control design. 5. Annual fire protection facilities inspection shall provide a copy of the acceptance letter for construction fire control; Certificate of fire protection products. 2. If necessary, our company can provide assistance to the customer to fill out the relevant fire-fighting facilities statistics form. In order to provide fire monitoring service to our customers, please truthfully fill in the following form: I. overview of fire fighting engineering The name of the project The project address Fire control approval approval (fire acceptance approval) For the record, The construction unit The contact telephone Construction unit The contact telephone Design units The contact telephone Maintenance unit The contact telephone Completion date Drawings information With a total area of High floor Floor layer The towe

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档