浮法 英文(Float in English).doc

  1. 1、本文档共32页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浮法 英文(Float in English) 2.2 strengthen the wall of cooling pond and chest wall As late kiln burning loss and operation are partial material, the material of wall brick has been washed before and after the thin, breast wall brick end was burn out how the hook or clearance brick through the fire, make it face under the support of the iron and tower plate due to the lack of protection and direct exposure to the furnace flame, if improper handling time. Probably because of iron parts (slap iron, iron plate) burning kiln body deformation caused serious, eventually led to the small furnace crib and breast wall slope collapse and cannot be redeemed. Use the fan blowing to protect the traditional operating method of iron parts, although can properly reduce the temperature of burning area, ease the sustained high temperature to increase the risk of loss, but, in the late kiln using loss serious critical moment, the general cooling wind blowing protection schemes in this to no avail. So used in the erection of the gaps of the wall on both sides of compressed air piping, and prepare the duck bill directly high pressure cooling compressed air nozzle, pressure maintain at about 2 mpa, to block further burning flame iron; At the same time, a few rows of 160 x 40 x 40 (mm) T - shaped water bags are installed on the tray, and the water pressure is maintained at about 1MPa, which is forced to cool the area. The enhanced dual cooling protection measures effectively reduced the loss of the site. The refractory brick will be eroded, thinned and perforated after long use. If happens dont take measures, the molten glass occurs leakage, the flame out of accident, and around the steel structure will be damaged by high temperature, once the steel structure bear the refractory furnace will result in danger of collapse. The wall tiles of the melting section The wall brick of the wall, especially in the 1 ~ 5P area, will be greatly eroded by the wall tiles near the molten glass surface. In ord

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档