建筑工程定额与概预算(Construction engineering quota and budget)
The calculation results of the project quantity are kept in two decimal places, and the direct charge is calculated.
Construction project budget and cost control
1. Calculation
1. The history of a partial project time consumption data of 15 man-days m3, 20 man-days m3, 17 man-days m3, 21 man-days m3, 16 man-days m3, 40 man-days m3, 25 man-days m3, 18 man-days m3, 50 man-days m3, quadratic average method to determine the trial division subdivisional work time quota.
2. When determining the degree of stickup ceramic tile subdivisional work labor quota, because there is no historical data, and the measured method due to the influence of the operator, so the quota decided to let the quota personnel, technical personnel and production workers according to their experience estimation method to determine respectively, estimates of the above personnel as follows 1.3 m3 man-days, 1.6 m3 man-days, 0.9 m3 man-days, please press the experience estimation method to determine the man-hour quota of stickup ceramic tile.
2. Single item selection
1. The difference between construction budget and construction drawing budget is not.
A, use unit B, use drawing C, calculate level D, calculate rules
2. The following items which do not belong to other direct fees are.
A, temporary facility fee B, night construction increase fee C, project site pay D, inspection test fee
3. The project quantity of the integrated scaffold is calculated according to the area of the building.
The center line of the outer wall is multiplied by the high B of the building and the outer edge of the outer wall times the high C of the building and the clean line of the exterior wall times the high D and the building of the building
4. A building is a rectangular plane. The outer boundary line of its outer wall is 35 meters long and 10 meters wide.
A, 350 B, 420 C, 546 D, 525
5. The calculation of the amount of galvanized sheet metal works is calculated by area.
您可能关注的文档
- 现代机房建设应用初探_机房360_中国绿_20140924_115656(The application of modern computer room in the construction of computer room 360_ China green _20140924_115656).doc
- 现代教育原理作业3(Modern education principle work 3).doc
- 现代日本人的生活习惯(Modern Japanese life habits).doc
- 现代经济学(425)考试大纲(Modern economics (425) syllabus).doc
- 现代设计史总结(Summary of modern design history).doc
- 现代师范教育发展方向的探讨(The development direction of modern normal education).doc
- 现代物料配送与高效仓储管理(鲁鹏)(Modern material distribution and efficient warehouse management (lu peng)).doc
- 现行混凝土规范大全目录(更新至2015年7月)(Current comprehensive concrete specification catalogue (updated to July 2015)).doc
- 现浇箱梁(Cast-in-situ box girder).doc
- 现浇混凝土及钢筋混凝土模板工程量(Concrete and reinforced concrete template works).doc
文档评论(0)