网站大量收购独家精品文档,联系QQ:2885784924

建筑工程定额与概预算(Construction engineering quota and budget).doc

建筑工程定额与概预算(Construction engineering quota and budget).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑工程定额与概预算(Construction engineering quota and budget) The calculation results of the project quantity are kept in two decimal places, and the direct charge is calculated. Construction project budget and cost control 1. Calculation 1. The history of a partial project time consumption data of 15 man-days m3, 20 man-days m3, 17 man-days m3, 21 man-days m3, 16 man-days m3, 40 man-days m3, 25 man-days m3, 18 man-days m3, 50 man-days m3, quadratic average method to determine the trial division subdivisional work time quota. 2. When determining the degree of stickup ceramic tile subdivisional work labor quota, because there is no historical data, and the measured method due to the influence of the operator, so the quota decided to let the quota personnel, technical personnel and production workers according to their experience estimation method to determine respectively, estimates of the above personnel as follows 1.3 m3 man-days, 1.6 m3 man-days, 0.9 m3 man-days, please press the experience estimation method to determine the man-hour quota of stickup ceramic tile. 2. Single item selection 1. The difference between construction budget and construction drawing budget is not. A, use unit B, use drawing C, calculate level D, calculate rules 2. The following items which do not belong to other direct fees are. A, temporary facility fee B, night construction increase fee C, project site pay D, inspection test fee 3. The project quantity of the integrated scaffold is calculated according to the area of the building. The center line of the outer wall is multiplied by the high B of the building and the outer edge of the outer wall times the high C of the building and the clean line of the exterior wall times the high D and the building of the building 4. A building is a rectangular plane. The outer boundary line of its outer wall is 35 meters long and 10 meters wide. A, 350 B, 420 C, 546 D, 525 5. The calculation of the amount of galvanized sheet metal works is calculated by area.

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档