现浇混凝土及钢筋混凝土模板工程量(Concrete and reinforced concrete template works)
It depends on the local quota, too much content. The following are the following:
1. The amount of concrete and concrete template works is calculated according to the following rules:
1. The amount of concrete and reinforced concrete template works shall be calculated in square meters except for the other regulations. If the contact area of the template is calculated using the modulus of modulus, the amount of engineering is equal to the volume of the component (the modulus of the module is included in the appendix).
2, single span reinforced concrete wall, board area of holes within 0.3 , shall not be deducted, dont add another hole in the wall template, but it outstand the wall of the lateral wall template shall be increased accordingly. Single-hole area outside the 0.3 holes, shall be deducted, hole wall template area into a wall, plate calculation within a template of quantities.
3, cast-in-situ reinforced concrete frame respectively according to the relevant provisions of the column, beam, wall, board, single column into the attached wall wall calculation of quantities on the wall, double wall column by column calculation, but after the amount of water wall, plate belt is not deducted.
4. The equipment bolt holes or equipment bolts shall be calculated according to different depth at different depths. The second grouting is calculated according to the volume of solid irrigation.
5. Precast concrete panel or edge patch with a width of 100mm, the template shall be calculated according to the plate quota.
6. The outer surface of the constructional column should be calculated according to the surface of the exposed section (the zigzag shape, the width of the width of the template is calculated according to the width of the blade). The surface area of the construction column shall not be calculated.
7, cast-in-situ concrete awning, balcony, horizontal cantilever slab, according to the size of this p
您可能关注的文档
- 浮点数到整数的快速转换(A rapid conversion of a floating point to an integer).doc
- 浮法 英文(Float in English).doc
- 浮力问题是初中物理教学的重点和难点,是近几年中考力学内容的重要...(The problem of buoyancy is the key and difficulty of physics teaching in junior high school.).doc
- 港口航道施工工艺技术分析(Technical analysis of port channel construction technology).doc
- 灯具店灯饰销售分析(Lighting store lighting sales analysis).doc
- 港口物流(Port logistics).doc
- 狗瘟三十天(Dog plague 30 days).doc
- 海底的秘密评价(A secret assessment of the seabed).doc
- 海德堡故障处理2(Heidelberg fault processing 2).doc
- 海关常用语(customs).doc
文档评论(0)