网站大量收购独家精品文档,联系QQ:2885784924

现浇箱梁(Cast-in-situ box girder).doc

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
现浇箱梁(Cast-in-situ box girder) The construction scheme of continuous box girder is now pouring 1. Design introduction This bridge upper structure for the 4 hole a league (4 x 25 m) cast-in-situ prestressed concrete box girder, beam high of 1.40 m, 1.0 m high box office, bridge span 100 m, 15.0 m wide, about double, single width 7.5 m, the beam bottom width 3.75 m. Of this bridge and main into orthogonal plane in the straight line segment, after A few located at 60, R = A = 60 m easement curve segment, longitudinal located in longitudinal slope + 3.8%, 2.4%, the vertical curve radius R = 2000 m on the vertical curve of bridge deck with bi-directional cross slope 2%, bridge deck transverse slope with box girder integral spin and become. The bridge deck adopts the single double GPZ3DX basin type support, the pier no.2 pier adopts the piers consolidation, and the 1st and 3rd pier adopts single GPZ6DX basin type support. Under the bridge, the geological conditions are 4 m thick subclay, 5 m thick clay pebbles, siltstone and so on. 2. Overview of construction plan (1) support base To clean up, can the construction of bridge site leveling, backfill slag down 1 m, compaction, and then use filling to beam down slag powder sandstone under 1 m, when the filling layer paving compaction, layering thickness of 40 cm, when filling pile embedment subsidence for settlement observation, once every three days of observation, after a month until the filling is complete, and three times each settlement is less than 3 mm, and unload 1 m, leveling, rolling, tested in accordance with requirements after the last 10 cm thick cobble laid, casting 10 cm thick concrete C20 element as a support base. See figure 1 for details. (2) the stent was set up According to the design scheme, the construction of the manchuang stand is used, and the construction is carried out before and after the construction. In the bracket after the completion of the foundation construction of box girder bracket lofting,

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档