现浇箱梁(Cast-in-situ box girder)
The construction scheme of continuous box girder is now pouring
1. Design introduction
This bridge upper structure for the 4 hole a league (4 x 25 m) cast-in-situ prestressed concrete box girder, beam high of 1.40 m, 1.0 m high box office, bridge span 100 m, 15.0 m wide, about double, single width 7.5 m, the beam bottom width 3.75 m. Of this bridge and main into orthogonal plane in the straight line segment, after A few located at 60, R = A = 60 m easement curve segment, longitudinal located in longitudinal slope + 3.8%, 2.4%, the vertical curve radius R = 2000 m on the vertical curve of bridge deck with bi-directional cross slope 2%, bridge deck transverse slope with box girder integral spin and become. The bridge deck adopts the single double GPZ3DX basin type support, the pier no.2 pier adopts the piers consolidation, and the 1st and 3rd pier adopts single GPZ6DX basin type support. Under the bridge, the geological conditions are 4 m thick subclay, 5 m thick clay pebbles, siltstone and so on.
2. Overview of construction plan
(1) support base
To clean up, can the construction of bridge site leveling, backfill slag down 1 m, compaction, and then use filling to beam down slag powder sandstone under 1 m, when the filling layer paving compaction, layering thickness of 40 cm, when filling pile embedment subsidence for settlement observation, once every three days of observation, after a month until the filling is complete, and three times each settlement is less than 3 mm, and unload 1 m, leveling, rolling, tested in accordance with requirements after the last 10 cm thick cobble laid, casting 10 cm thick concrete C20 element as a support base. See figure 1 for details.
(2) the stent was set up
According to the design scheme, the construction of the manchuang stand is used, and the construction is carried out before and after the construction. In the bracket after the completion of the foundation construction of box girder bracket lofting,
您可能关注的文档
- 点式玻璃雨蓬的施工方法(Construction method of point glass canopy).doc
- 浮点数到整数的快速转换(A rapid conversion of a floating point to an integer).doc
- 浮法 英文(Float in English).doc
- 浮力问题是初中物理教学的重点和难点,是近几年中考力学内容的重要...(The problem of buoyancy is the key and difficulty of physics teaching in junior high school.).doc
- 港口航道施工工艺技术分析(Technical analysis of port channel construction technology).doc
- 灯具店灯饰销售分析(Lighting store lighting sales analysis).doc
- 港口物流(Port logistics).doc
- 狗瘟三十天(Dog plague 30 days).doc
- 海底的秘密评价(A secret assessment of the seabed).doc
- 海德堡故障处理2(Heidelberg fault processing 2).doc
最近下载
- 《肠内肠外营养护理》课件.ppt VIP
- 国家噪音标准规范.doc VIP
- 第2课 土特产包装设计 课件 2023—2024学年浙美版初中美术八年级上册.pptx VIP
- 中考语文诗词鉴赏《桃花源记》《感士不遇赋(并序)》《归园田居》《饮酒》含答案.docx
- 5万吨农副产品加工冷链物流建设项目可研性分析报告.doc VIP
- (6S管理)污水自来水处理厂自来水厂目可视化管理设计方案.pptx VIP
- 化工设计习题及答案.doc
- 综合应用能力事业单位考试(中小学教师类D类)试卷与参考答案(2024年).docx VIP
- 四年级下册劳动《包装礼品盒》PPT课件.pptx VIP
- 正己烷-安全技术说明书MSDS.docx VIP
文档评论(0)