点式玻璃雨蓬的施工方法(Construction method of point glass canopy).doc

点式玻璃雨蓬的施工方法(Construction method of point glass canopy).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
点式玻璃雨蓬的施工方法(Construction method of point glass canopy) Construction method of point glass canopy The rain-covered glass curtain wall is used to support the steel beam in the original structure. Install the stainless steel in the steel structure framework to link claw fixed glass, glass corners as four support loading mode under wind load and earthquake action, will force to the steel beam to civil engineering structure. 1. Construction preparation for the rain 1.1 preparation of the construction technology 1.1.1 organizational design personnel to make rain loose construction drawing, according to the scheme design process audit, detailed drawing, modify, proofreading, signature, to the city after the drawings audit department audit, in the engineering projects. 1.1.2 organize professional engineering technicians from the project department, and the senior technicians carefully read the picture, carefully study and formulate the on-site construction plan, and answer the difficult questions to the design of the company. 1.1.3 make practical and feasible technical plan for the site and process of construction difficulty. 1.1.4 before construction, the project technicians of the project department shall make a technical disclosure to the construction team leader and the team leader to make clear the control of the working procedure and formulate corresponding measures. 1.2 preparation of construction equipment in rain For the tools, appliances and hoisting equipment required for the project of the project, the plan shall be submitted to the purchasing department and the warehouse according to the model, quantity and supply time. 1.3 preparation of construction materials Rain loose material according to the provisions of the company purchasing procedure, purchasing before purchasing plan, clear purchasing material name, specification, quantity, standard, comprehensive review of material suppliers, only to review the qualified supplier purchasing materials, to strictly co

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档