网站大量收购独家精品文档,联系QQ:2885784924

工程造价人工费用构成与控制分析(Construction cost labor cost structure and control analysis).doc

工程造价人工费用构成与控制分析(Construction cost labor cost structure and control analysis).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程造价人工费用构成与控制分析(Construction cost labor cost structure and control analysis) Construction cost labor cost structure and control analysis Time: 2011-04-21 14:37:32 source: graduation thesis fan wen author: rank name Paper introduction: the project cost is refers to the construction project decision-making, design and construction through analysing to the different stages of the completion acceptance, delivery and use, complete construction, equipment installation, equipment and instruments purchase and other corresponding construction, and form and the total sum of expenses of fixed assets. Direct engineering fees include fixed direct fees (including labor, materials, construction machinery usage fees) and other direct fees. Below, we analyze the composition and control of labor cost in engineering cost management. According to the current situation of market economy development, it is concluded that there are five factors influencing factors. Key words: engineering cost, labor cost, composition, influencing factors The foreword 0. Engineering cost is refers to the construction project decision-making, design and construction through analysing to the different stages of the completion acceptance, delivery and use, complete construction, equipment installation, equipment and instruments purchase and other corresponding construction, and form and the total sum of expenses of fixed assets. Determine the focus of the project cost is calculated according to building construction drawing quantities, then apply the budget quota to determine consumption affecting labor, materials, machinery, and in accordance with the prescribed procedures and valuation method to calculate direct, indirect expenses, profit and tax, finally it is concluded that the project cost. Construction project cost, according to the latest classification standard of our country can be divided into direct fee, indirect fee and other cost 3 most. Free essays. Direct engineering fees include fixed direct f

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档