工地验收有用的啊(Site acceptance is useful).doc

工地验收有用的啊(Site acceptance is useful).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工地验收有用的啊(Site acceptance is useful) What does the geology report look at 1. Firstly, the evaluation of the site and the Suggestions on the basic selection of the site should be clearly understood, so that the general situation of the site will be well understood. 2. Evaluation and understanding of geological structure, soil layer distribution, site stability and evenness of the site according to geological profile and physical indexes of soil layers; 3. Determine the basic form; 4. Based on the basic form, determine the foundation bearing layer, foundation buried depth, soil layer data and so on; 5. Settlement data analysis; 6. Whether the adverse geological conditions, such as soil caves, caves, soft soil and groundwater, are found to affect the basis of the geological conditions. Etc. Pay attention to the geological report about groundwater often have such a survey and did not see the groundwater during, if take the basement, venue for the impervious soil, rock, for example, when the design considering water pressure, once the foundation pit water, and water and nowhere to go, if the design without considering the trouble. 2. What is the inspection of rebar Steel anchorage; 2. Quantity and diameter of steel bar; 3 bar spacing; 4 reinforcement protection layer; 5 hoop hooks; 6 after pouring steel bar; 7. 8. Length of rebar lap and joint rate; 9. 10 reinforcement certificate and test report. What exactly is the test for In order to determine the local treatment of abnormal foundation, it is to find out the soil quality and special soil conditions of the base groove. Whether the original drilling needs to be supplemented, whether the original basic design needs to be amended, to confirm the information and the external environment of the project. Whether the soil layer of the subsoil is the soil layer of data given by the geological department when it reaches the design, whether there is any difference, it is mainly responsible for the investigation personnel; 2. Whe

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档