- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工地验收有用的啊(Site acceptance is useful)
What does the geology report look at
1. Firstly, the evaluation of the site and the Suggestions on the basic selection of the site should be clearly understood, so that the general situation of the site will be well understood.
2. Evaluation and understanding of geological structure, soil layer distribution, site stability and evenness of the site according to geological profile and physical indexes of soil layers;
3. Determine the basic form;
4. Based on the basic form, determine the foundation bearing layer, foundation buried depth, soil layer data and so on;
5. Settlement data analysis;
6. Whether the adverse geological conditions, such as soil caves, caves, soft soil and groundwater, are found to affect the basis of the geological conditions. Etc. Pay attention to the geological report about groundwater often have such a survey and did not see the groundwater during, if take the basement, venue for the impervious soil, rock, for example, when the design considering water pressure, once the foundation pit water, and water and nowhere to go, if the design without considering the trouble.
2. What is the inspection of rebar
Steel anchorage;
2. Quantity and diameter of steel bar;
3 bar spacing;
4 reinforcement protection layer;
5 hoop hooks;
6 after pouring steel bar;
7.
8. Length of rebar lap and joint rate;
9.
10 reinforcement certificate and test report.
What exactly is the test for
In order to determine the local treatment of abnormal foundation, it is to find out the soil quality and special soil conditions of the base groove. Whether the original drilling needs to be supplemented, whether the original basic design needs to be amended, to confirm the information and the external environment of the project.
Whether the soil layer of the subsoil is the soil layer of data given by the geological department when it reaches the design, whether there is any difference, it is mainly responsible for the investigation personnel;
2. Whe
您可能关注的文档
- 巴氏奶与普通奶的区别(The difference between buttermilk and regular milk).doc
- 巴勒斯坦旅游旅行攻略(Travel guide to Palestine).doc
- 帮你认字(To help you read).doc
- 巴西ncm 号码(Brazil NCM number).doc
- 帮助我们祛湿的食物(Help us eat clearing damp).doc
- 布法罗旅游指南 (buffalo guide) - 纽约州出境游指南 yododo 游多多(Buffalo guide - New York state travel guide yododo Tours).doc
- 布料机在水泥混凝土路面摊铺施工中的应用_石磊(Application of cloth machine in cement concrete pavement paving construction).doc
- 布料基本知识(Fabric basics).doc
- 布鲁氏菌病防治技术规范(Technical specification for brucellosis).doc
- 布什在林肯号航空母舰上的讲话(Bush's speech on the uss Abraham Lincoln).doc
文档评论(0)