工民建专业毕业论文(Graduation thesis of civil engineering).doc

工民建专业毕业论文(Graduation thesis of civil engineering).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工民建专业毕业论文(Graduation thesis of civil engineering) Chapter 1 engineering general situation of the project of xinxiang jinxiu waterproof material co., LTD. 1 workshop steel structure engineering, construction specifications for 68.6 X44.5 M, monolayer steel structure, AE shaft 17 line is double slope roof, AG axis line 511 to shed roof, lower eaves of 3.1 M, 8.12 M high eaves; The built-in galvanized tin trench, with an area of about 2550M2, has a 50mm thick EPS sandwich board. The design of the project is 50 years, and the safety grade of building structure is secondary. The live load is 0.3 KN/m2. Material selection: main steel component material and Q345B, the secondary steel component is Q235. The construction contents of this engineering steel structure mainly include main steel frame member, floor board, roof and wall panel maintenance system. The main steel frame is welded h-shaped steel, and the sub-component includes pillar support, horizontal support, and connecting beam, etc. High strength bolts are used in performance grade 10.9 s-class friction high strength bolts, nuts and gasket (no.45 steel). The surface treatment of steel structural components requires the use of sand blasting or ejection method to remove the rust requirement of Sa2.0. High strength bolt connection interface using sandblast or mass ejection processing, processing after the joint between the components of friction surface slip resistance coefficient is not less than 0.50, the high strength bolt connection after coating shall be in the final twist. The surface of steel structure should thoroughly remove rust, slag, burr, oil and other adhesion before applying primer. Blasting or ejection of the main steel member surface immediately brush acid primer second, then spraying fire retardant coating, fire resistance grade level two. After the installation is completed, the parts of the unprimed primer and the parts of the transport installation shall be repainted. The parts of unpainted prime

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档