网站大量收购独家精品文档,联系QQ:2885784924

市政清单道路计算规则(City list road calculation rules).doc

市政清单道路计算规则(City list road calculation rules).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
市政清单道路计算规则(City list road calculation rules) Road engineering Said Ming 1. General description (a) the road works quota shall be applied to the construction, expansion and reconstruction of municipal, factory and living areas and other roads and square projects in the urban areas. (2) the earth square in the road base level shall be the compaction party, which is unpriced, which includes the transportation of less than or less than 500m, and when 500m is taken out of the soil, the corresponding increase rate of the earthwork will be carried out. 2. Roadbed processing instructions (a) consolidation of the foundation refers to the work done on a natural foundation or on a land basis. The quota does not include the cost of the tamping work before the compaction, such as the design requirements for the tamping and calculation. (2) the ground compaction of the foundation shall be filled with foreign soil (stone) and the corresponding project shall be carried out. (3) the number of ramming strikes is the number of times that the ramming machine does not shift continuous ramming at one point. When the compaction of all points in the area of the ramming area is required to complete the tamping; If the tamping is needed again, the corresponding item should be applied again according to the number of tamping times. (4) low-hammer full ramming implementation of ramming energy is less than 1200kN · m, 2 strike/point project. (5) road bed rolling, shoulder and sidewalks plastic rolling quota including average thickness of 10 cm or less artificial low and high fills-in, flat road bed, design requirements of the slope, and the heavy roller compaction, to meet the design requirements. (6) the subgrade blind ditch quota does not include the abandonment, transportation and disposal of the earth, and the earth shall be calculated according to the corresponding project of the earthwork project. (7) the old pavement chisel refers to the use of the old pavement to make the surface layer

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档