市政清单道路计算规则(City list road calculation rules)
Road engineering
Said Ming
1. General description
(a) the road works quota shall be applied to the construction, expansion and reconstruction of municipal, factory and living areas and other roads and square projects in the urban areas.
(2) the earth square in the road base level shall be the compaction party, which is unpriced, which includes the transportation of less than or less than 500m, and when 500m is taken out of the soil, the corresponding increase rate of the earthwork will be carried out.
2. Roadbed processing instructions
(a) consolidation of the foundation refers to the work done on a natural foundation or on a land basis. The quota does not include the cost of the tamping work before the compaction, such as the design requirements for the tamping and calculation.
(2) the ground compaction of the foundation shall be filled with foreign soil (stone) and the corresponding project shall be carried out.
(3) the number of ramming strikes is the number of times that the ramming machine does not shift continuous ramming at one point. When the compaction of all points in the area of the ramming area is required to complete the tamping; If the tamping is needed again, the corresponding item should be applied again according to the number of tamping times.
(4) low-hammer full ramming implementation of ramming energy is less than 1200kN · m, 2 strike/point project.
(5) road bed rolling, shoulder and sidewalks plastic rolling quota including average thickness of 10 cm or less artificial low and high fills-in, flat road bed, design requirements of the slope, and the heavy roller compaction, to meet the design requirements.
(6) the subgrade blind ditch quota does not include the abandonment, transportation and disposal of the earth, and the earth shall be calculated according to the corresponding project of the earthwork project.
(7) the old pavement chisel refers to the use of the old pavement to make the surface layer
您可能关注的文档
- 巴氏奶与普通奶的区别(The difference between buttermilk and regular milk).doc
- 巴勒斯坦旅游旅行攻略(Travel guide to Palestine).doc
- 帮你认字(To help you read).doc
- 巴西ncm 号码(Brazil NCM number).doc
- 帮助我们祛湿的食物(Help us eat clearing damp).doc
- 布法罗旅游指南 (buffalo guide) - 纽约州出境游指南 yododo 游多多(Buffalo guide - New York state travel guide yododo Tours).doc
- 布料机在水泥混凝土路面摊铺施工中的应用_石磊(Application of cloth machine in cement concrete pavement paving construction).doc
- 布料基本知识(Fabric basics).doc
- 布鲁氏菌病防治技术规范(Technical specification for brucellosis).doc
- 布什在林肯号航空母舰上的讲话(Bush's speech on the uss Abraham Lincoln).doc
文档评论(0)