网站大量收购独家精品文档,联系QQ:2885784924

室内消火栓系统管道安装工艺标准(Standard of indoor fire hydrant piping installation).doc

室内消火栓系统管道安装工艺标准(Standard of indoor fire hydrant piping installation).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
室内消火栓系统管道安装工艺标准(Standard of indoor fire hydrant piping installation) Standard of indoor fire hydrant piping installation (604-1998), 1 scope This process applies to the installation of indoor fire hydrant system piping for civil and general industrial buildings. 2 construction preparation 2.1 main materials: 2.1.1 the pipe material of hydrant system shall be selected according to the design requirements. Generally, carbon steel pipe or seamless steel tube shall not be used Bending, rust, heavy skin and concave and convex inequality. 2.1.2 the type of hydrant box shall conform to the design requirements, and the cabinet shall be smooth and clean. No rust in metal case, Scratches, the door opens flexible. The box is square, the parts in the box are complete. Valve external rules, no crack, open and close, close Close tight, sealing filler is in good condition, there are product factory certificate. 2.2 main machine tools: sleeve machine, grinding wheel saw, bench drill, electric hammer, hand grinding wheel, hand electric drill, electric welding machine, electric test pump, etc Machinery. Sets of silk board, pipe tongs, vise, pressure tongs, chain tongs, hammer, hacksaw, spanner, nail gun, reverse chain, electric welding Such tools. 2.3 operating conditions: 2.3.1 construction drawings and related technical documents shall be complete, and the on-site water, electricity and gas shall meet the continuous construction requirements and system equipment The material can guarantee normal construction. 2.3.2 the base line required for piping and box installation shall be determined and marked. The reserved and pre-buried has been completed with the construction. 3 operation process 3.1 technological process: Installation preparation - dry pipe installation - box and branch installation - box fittings installation - water debugging 3.2 installation preparation: 3.2.1 carefully familiar with the drawing, combined with the on-site situation to verify the coordinates of the pipe

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档