网站大量收购独家精品文档,联系QQ:2885784924

屋面防水保温施工方案(Roof waterproof and insulation construction scheme).doc

屋面防水保温施工方案(Roof waterproof and insulation construction scheme).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
屋面防水保温施工方案(Roof waterproof and insulation construction scheme) Roof waterproof and insulation construction scheme This article is contributed by niniki33 Recommended plan for waterproof insulation of roof in shanxi power plant Orders, record A, compilation basis... Recommend 2 2, waterproof plan... 2 1, not here roofing is basic structure level (fire prevention requirement) :... 2 2 basic construction level, not here roof (no fire prevention requirements) :... 3 basic construction level 3, master cheng yen roof:... 3, 4, basic structure, steel structure roofing levels:... Basic construction level, 4, 5, cooling cycle pool:... Four, five general detail node waterproof approach and detail... Five, construction preparation... Six, eight modified asphalt waterproofing materials hot melt construction operation points... 9 RFA, flame retardant and waterproof coiled material mechanical fixed operation key points of steel structure workshop ()... Ten, eight, waterproof coating construction operation point... Nine, construction matters needing attention:... 130, coil product protection... 13 11, coating product protection... 13 - 1 - Recommended plan for waterproof insulation of roof in shanxi power plant Roof waterproof and insulation construction scheme A, compilation basis, roofing engineering specification GB50345-2004 roofing construction quality acceptance specification GB50207-2002 elastomer modified asphalt waterproofing materials Second, recommend the waterproof plan extreme minimum temperature of 25.5 ℃ extreme maximum temperature 39.4 average annual rainfall 456.0 mm daily limit rainfall 39.4 mm maximum snow depth: 160 mm maximum frozen soil depth 770 mm, according to the above information in taiyuan region belongs to the climate is dry little rain all the year round, but there is big storm rain may focus; It is cold in winter and cool in summer. We suggest that the concrete structure of roof shall be used: A, no slope (or low slope) concrete structure with no slo

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档