外墙涂料施工方案 (好)(Construction scheme of exterior wall coating (good)).docVIP

外墙涂料施工方案 (好)(Construction scheme of exterior wall coating (good)).doc

  1. 1、本文档共29页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外墙涂料施工方案 (好)(Construction scheme of exterior wall coating (good)) Construction plan of the exterior wall paint of jibao jinyuan project Section 1 overview of engineering construction Project name: jibao jinyuan project of ruian city Construction unit: zhejiang jibao real estate development co. LTD Design unit: liaoning jinhai architectural design institute limited Supervisor: Beijing zhonglian ring supervision co. LTD Construction unit: China building 4 engineering bureau Section 2 overview of engineering projects This project is located in the liuhe block of anyang new area in ruian city, which is the riverside park of ruian city to the north, the cultural and art center of ruian city to the south, and jiuyi village to the west, and the yajrui river in the east. Garbo garden project, a total construction area of 93256.00 ㎡, including the basement construction area: 15428 ㎡. All the basement is connected in whole. Plus or minus 0.000 is equivalent to the yellow sea absolute elevation + 5.00 m, the main structure is the frame shear wall structure. There are 8 high-rise and small high-rise buildings in this project, and the general situation is: A, B, C and D, which are 11, 12, and height A and B are 40.650 m respectively, and C and D are 40.30 m respectively. The total height of the building is 61.30 m. H building 27 yue 28, total height of 91.850 m; Garbo jin garden engineering exterior wall coating with a total area of about: 70000 ㎡. Section 3 construction management and personnel allocation I. construction organization chart According to the actual situation of the project, construction management and personnel configuration are arranged as follows: 1. Responsible for the project: responsible for the supervision and coordination of the personnel, equipment and materials of the project, and ensure the normal operation of the site. 2. Project manager: responsible for the quality, progress and coordination of all aspects of the construction site, in charge of daily

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档