二级建造师学习资料(Secondary constructor study materials).doc

二级建造师学习资料(Secondary constructor study materials).doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
二级建造师学习资料(Secondary constructor study materials) A single topic 1. About asphalt mixture construction process requirement, the following statement is wrong () A dense gradation asphalt mixture compaction thickness of each layer, should not be less than the nominal maximum aggregate grain diameter of 2.5 ~ 3 times. Proper placement of asphalt concrete B important 100 ~ 200 m test section, the main points and trial mix, shop test, two stages, and obtained the corresponding parameter. C after the hot mix asphalt mixture pavement construction for natural cooling, the surface temperature is below 600 C, can allow vehicles. D hot mix asphalt mixture on the adjacent two radial and transverse joints of the lower construction should be staggered 1 m to. Answer: C parsing: when the surface temperature is too high to traffic mixture, easy forming rutting disease. 2, the city distance, the expressway, the surface layer of asphalt mixture through (test, the rutting resistance ability of the test, the indicators are dynamic stability. A Marshall answer: B resolution: to test the mixture temperature stability under high temperature in summer season, rutting test should be done. 3. The urban arterial road, the construction of expressway hot mix asphalt mixture in the temperature below (, unfavorable construction. A. 15 answer: D B. 18 C, 12 D. 10) 0 C b. high temperature rut c. D compressive strength flexural) Analytic: construction of the asphalt layer under low temperature, compaction degree is insufficient, often occurred in the asphalt road surface early cracking, goes on quality such as disease. 4. The hot mix asphalt mixture paving the echelon form operations of longitudinal seam should be hot after sewing. The lower level of longitudinal seam should be staggered over (). A. 50 mm answer: B resolution: longitudinal seam stagger on lower level, main is to avoid reflection cracks. 5. Urban expressway, the arterial road asphalt concrete mix appropriate USES (batch. A continuous

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档