人工开挖桩基础工程安全技术交底(Artificial excavation pile foundation engineering safety technology)
Safety technical disclosure construction unit
The division sub-item project name manual excavation pile engineering production class name ordinary operator
Disclosure content artificial dig-hole pile safety technical disclosure one, operation conditions
1, manual excavation pile hole wall supporting should be based on the characteristics of the regions soil, underground water distribution
Besides, compiling feasible construction schemes for borehole wall bracing calculation and design.
2. The site should be completed before excavation. Ground, underground cables, pipelines, old buildings,
The equipment foundation and other obstacles have been eliminated. temporary facilities such as power, ventilation, lighting,
Safety facilities are ready.
3, dig a hole plane size in order to facilitate the construction advisable but shall not be less than the design of pile section size.
Prohibit violations dig-hole pile operations drilling difficulties area of bad geological design units to be designed
The security design and according to provisions of design change approved before implementation.
4, in the region of the underground water level is higher to take measures to reduce the underground water level. Construction of the hole pile
When the situation is now larger water should adjust the construction plan.
5, artificial dig-hole operation is very important to the safety of the construction personnel to conduct a comprehensive safety before excavation
Technical clarificaiton sling for safe and reliable examination before operation and test to ensure construction safety.
6. Women and minors under the age of 18 shall be strictly prohibited from working in the hole piles and in the fourth place stipulated by the state
Level physical labor intensity related activity activity.
2. Safety protection measures for the construction of artificial excavation piles
w
您可能关注的文档
- 仓储单选(Warehousing radio).doc
- 仓库管理制度(Warehouse management system).doc
- 产品的跟踪物料(Product tracking materials).doc
- 产品介绍(Product introduction).doc
- 产品美学(Product aesthetics).doc
- 产品评估(Product evaluation).doc
- 产品示范(Product demonstration).doc
- 串口并口PCI 接口总结(Serial interface and PCI interface summary).doc
- 串行实时时钟芯片DS1302程序设计中的问题与对策(Problems and countermeasures of serial real-time clock chip DS1302 program design).doc
- 串口连接线制作方法(Method of serial connection).doc
- 高中语文批判性写作教学与信息技术应用研究教学研究课题报告.docx
- 普通高中学生生涯规划指导中的生涯规划法律研究教学研究课题报告.docx
- 基于物联网的设备远程监控与故障诊断的智能算法研究教学研究课题报告.docx
- 6 《自动驾驶技术在物流运输行业中的车联网安全与隐私保护策略研究》教学研究课题报告.docx
- 《职业院校“双证书”制度实施中的教学资源整合研究》教学研究课题报告.docx
- 《区域大气污染联防联控机制下跨部门协同治理的环保产业布局优化效果评估》教学研究课题报告.docx
- 基于生物3D打印技术的生物可降解支架材料在牙科中的应用教学研究课题报告.docx
- 基于远程监控的数字化小学语文实践教学管理研究教学研究课题报告.docx
- 区块链技术赋能下的初中生个性化学习路径追踪与优化策略研究教学研究课题报告.docx
- 小学英语AI教育资源沉浸式虚拟现实交互设计对学生口语表达能力的提升教学研究课题报告.docx
文档评论(0)