网站大量收购独家精品文档,联系QQ:2885784924

人工开挖桩基础工程安全技术交底(Artificial excavation pile foundation engineering safety technology).doc

人工开挖桩基础工程安全技术交底(Artificial excavation pile foundation engineering safety technology).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
人工开挖桩基础工程安全技术交底(Artificial excavation pile foundation engineering safety technology) Safety technical disclosure construction unit The division sub-item project name manual excavation pile engineering production class name ordinary operator Disclosure content   artificial dig-hole pile safety technical disclosure  one, operation conditions 1, manual excavation pile hole  wall supporting should be based on the characteristics of the regions soil, underground water distribution Besides,   compiling feasible construction schemes for borehole wall bracing calculation and design. 2. The site should be completed before excavation. Ground, underground cables, pipelines, old buildings, The equipment foundation and other obstacles have been eliminated.  temporary facilities such as power, ventilation, lighting, Safety facilities are ready. 3, dig a hole plane size  in order to facilitate the construction advisable  but shall not be less than the design of pile section size. Prohibit violations dig-hole pile operations  drilling difficulties area of bad geological  design units to be designed The security design and  according to provisions of design change approved before implementation. 4,  in the region of the underground water level is higher to take measures to reduce the underground water level. Construction of the hole pile When the situation is now larger water  should adjust the construction plan. 5, artificial dig-hole operation is very important to the safety of  the construction personnel to conduct a comprehensive safety before excavation Technical clarificaiton  sling for safe and reliable examination before operation and test  to ensure construction safety. 6. Women and minors under the age of 18 shall be strictly prohibited from working in the hole piles and in the fourth place stipulated by the state Level physical labor intensity related activity activity. 2. Safety protection measures for the construction of artificial excavation piles  w

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档