五大员考试试题(The top five exam questions).doc

五大员考试试题(The top five exam questions).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
五大员考试试题(The top five exam questions) In 2011, the engineer simulated the test 1. Fill in the blanks (10 questions, 2 points per question) The three elements of force are and. The force of the force is the line. 2. Seasonal construction mainly refers to the construction process. 3. When pouring concrete, the free-fall height should not exceed meter, and in the vertical structure, it shall not exceed meters. In case of excess, the concrete shall be adopted to prevent the occurrence of concrete. 4. The construction of reinforced concrete structure is composed of several sub-projects. 5. The method of technical delivery shall be based on the principle of priority, and should be accompanied by both parties when necessary. 6. The connection method of steel bar is connected. 7. Casting of large volume concrete structure, according to the structure characteristics, can be divided into, etc. 8. The inspection and evaluation of concrete are divided into two categories. 9. Waterproof engineering can be divided into two categories according to its use materials. 10. The building form of brick wall is mainly, and. 2. Single topic selection (total 10, 2 points per question) 1. The standard test for measuring the strength of concrete is () mm. A. 70.7 x 70.7 * 70.7. 100 x 100 times 100 c.150 x 150 x 150 x 150 x 200 x 200 x 200 2. The total width of the building is 13m, and the roof slope is 2% (both sides). The height of the roof shall be (). A, 130 ㎜ B, 130 ㎜ C, 200 ㎜ D, 260 ㎜ 3. The structure of the aseismatic requirements shall be at least () the length of the straightening part of the band. A, 3d B, 5d C, 6.25d d, 10d 4. The concrete curing time should not be less than () for anti-seepage resistance. A, 3 days B, 7 days C, 14 days D, 28 days 5. During construction of reinforced concrete structures, the construction joints shall remain in the structure () small and convenient for construction. A pressure B shear C tension D stress 6. In order to adjust the setting time of Portl

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档