中石北京 工程概预算与招投标 第二阶段在线作业(Zhongshi Beijing project budget and bidding for the second stage of online operation).doc
- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中石北京 工程概预算与招投标 第二阶段在线作业(Zhongshi Beijing project budget and bidding for the second stage of online operation)
As a industry
Article 1 construction enterprises are directly used for construction, installation and highway engineering and other construction management
Your answer: A
Title score: 0.5
Score: 0.5
Remark: concept of construction quota
Second question
According to the nature of the project, the classification of construction quota can be divided into () categories (as shown in FIG. 3-4).
Your answer: C
Title score: 0.5
Score: 0.5
Remark: classification of construction quota
The work time that must be consumed by the completed unit must be completed
Your answer: A
Title score: 0.5
Score: 0.5
Remark: labor quota
Number 4 is the quantity of qualified products completed in the unit time
Your answer: B
Title score: 0.5
Score: 0.5
Remark: labor quota
In the labor quota representation, the two columns represent the time quota and output quota respectively. This is the () notation
Your answer: A
Title score: 0.5
Score: 0.5
Remark: labor quota
The unit price of itemized projects and the budget quota for direct and time-consuming selection are usually handled according to the following ()
Your answer: C
Title score: 0.5
Score: 0.5
Remarks: construction drawing budgeting method
Problem 7 () is the number of projects expressed in the measured units
Your answer: A
Title score: 0.5
Score: 0.5
Remark: the role of engineering quantity
The size of the logo on the design document of the construction drawing shall be in meters and the other dimensions shall be the unit
Your answer: D
Title score: 0.5
Score: 0.5
Remarks: engineering quantity calculation requirements
In order to avoid omission and prevent recomputation, the calculation of the same item should be calculated in the direction of ()
Your answer: A
Title score: 0.5
Score: 0.5
Remark: the calculation sequence of the project quantity
Article 10 the function of building area is mainly reflected in the following () asp
您可能关注的文档
- 仓储单选(Warehousing radio).doc
- 仓库管理制度(Warehouse management system).doc
- 产品的跟踪物料(Product tracking materials).doc
- 产品介绍(Product introduction).doc
- 产品美学(Product aesthetics).doc
- 产品评估(Product evaluation).doc
- 产品示范(Product demonstration).doc
- 串口并口PCI 接口总结(Serial interface and PCI interface summary).doc
- 串行实时时钟芯片DS1302程序设计中的问题与对策(Problems and countermeasures of serial real-time clock chip DS1302 program design).doc
- 串口连接线制作方法(Method of serial connection).doc
文档评论(0)