- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
陶瓷马赛克地面做法2(Ceramic mosaic ground practice 2)
Wall, cylinder, paste ceramic, glass mosaic tile (mosaic)
I. construction preparation
1, materials
The cement: 325 and above the ordinary portland cement or slag Portland cement.
The white cement: 325 white cement (wipe seam).
In the sand.
The lime paste: when used in plaster should not contain particles and impurities of uncured. For example, when using lime powder, soak in water a week ahead of time.
The ceramics, glass mosaic (mosaic): varieties, specifications and color according to the design requirements, and have product certification.
2, operating conditions
The ceiling, wall plastering construction completed column flour brush.
The cylindrical wall concealed pipes, electrical box making and installation of doors and windows, and passed the test.
The gap between the window panels, door and window frames and wall columns installed with 1:2.5 cement mortar block was compacting (determined aluminum door and window edge slot impaction material shall be design); aluminum doors and windows cabinet should be protected by film.
The cylindrical wall clean (no oil, floating pulp, residual ash etc.), effect of mosaic (mosaic) paving convex wall cylinder should be cut, excessive depression 1: 2.5 application of cylindrical wall cement mortar layer with pressure leveling. (water first, wet and then plaster).
Two, process flow
The basic treatment, ash cake, paste steel reinforcement to wet the substrate, wipe the bottom mortar, mortar, with middle row lattice elastic line, pre wetting paper, paper, tiling, sewing, adjustable seam seam cleaning wipe wipe
Three, operation process
1, grass-roots treatment of dust
The base for concrete cylindrical wall:
For smooth surface base, should be first hair, and brush with steel wire brush again, and then pour water
Moist。
The smooth surface of the base should be treated with wool. Surface dust soon,
Clean the dirt, wet the water, sprinkle with 1:1 cement mortar, or throw the mortar to the
您可能关注的文档
- 书法课外活动小组记录(Calligraphy extracurricular activity group record).doc
- 使用排列码加密循环字符串(Use the permutation encryption loop string).doc
- 书面表达(Written communication).doc
- 书上学不到的35条保命驾驶技巧(35 tips for driving without a book).doc
- 书写人类灾后重建史上壮丽篇章·南方日报数字报·南方报网(Writing a magnificent chapter in the history of human reconstruction).doc
- 体现中国文化的酒店建筑装饰风格浅析(A brief analysis of hotel architectural decoration in Chinese culture).doc
- 体育竞赛题(Sports competition).doc
- 体育类英语单词(Sports English words).doc
- 体育一般用语(Sports idioms).doc
- 丸九鲤鱼饵料详解(Detailed explanation of bait fish bait).doc
- 职业学院金山湾产教融合示范项目可行性研究报告申请报告.doc
- 职业教育智能实训设施提升可行性研究报告申请建议书YYY.doc
- 富士施乐Apeos C7071_C6571_C5571_C4571_C3571_C3071参考指南操作篇.pdf
- 富士施乐Apeos4620SDF使用说明书用户指南.pdf
- 富士施乐AC7071_C6571_C5571_C4571_C3571_C3071参考指南附录篇.pdf
- 富士施乐AC7071_C6571_C5571_C4571_C3571_C3071参考指南选装装置篇.pdf
- 人工智能科技主题高端简约模板88.pptx
- 人工智能科技主题高端简约模板14.pptx
- 人工智能科技主题高端简约模板55.pptx
- 人工智能科技主题高端简约模板119.pptx
文档评论(0)