精馏塔开停车步骤(The rectification tower drives the parking step).docVIP

精馏塔开停车步骤(The rectification tower drives the parking step).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
精馏塔开停车步骤(The rectification tower drives the parking step) The rectification tower drives the parking step Driving is a very important part of production. The goal is to shorten the time of driving, save the cost, and get the qualified products as soon as possible. Parking is a very important link in production, when the device is running after a certain period, equipment and instrument will be all sorts of problems, continue to maintain production in terms of production capacity and raw material consumption has not meet the requirements of the economic and reasonable, also contains the potential risk of accidents, so need to stop for maintenance, to achieve device failure, as soon as possible into the maintenance phase, must be prepared to stop work, formulate reasonable parking steps, prevent all kinds of possible problems. Take the usual steps of parking The general steps of driving a distillation column include the following steps: A) develop reasonable driving procedures, timetable and necessary preventive measures; Prepare the necessary supplies of raw materials and water and electricity; Prepare the staff and complete the corresponding training. B) at this point, the structure of the tower must comply with the design requirements, tower and tidy, no solid impurities, no congestion, and eliminate all should not be in the form of a, such as the tower of oxygen and moisture content must conform to the provisions; Normal operation of pump and instrument; The security measures have been adjusted. C) pressure and decompression of the tower to normal operation pressure. D) heating and cooling the tower to close the operating temperature. E) add ingredients to the tower. F) open the tower top condenser and the heat source of the reboiler and various heaters, the cooling sources of all kinds of coolers. G) the operating conditions and parameters of the tower are gradually adjusted to make the tower load, and the product quality gradually reaches normal operation value

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档