采用磨内喷水的几点体会(Some experience of using water jet in grinding)
Author: unit: [2008-9-19]
Keyword: cement grinding - water jet
Abstract:
4 3.8m 12m * cement grinding machines in a plant are made of water jet in the mill. Spraying a small amount of mist water into the grinding bunker of the cement mill can reduce the temperature in the mill and restrict the electrostatic adsorption of the fine powder, thus avoiding the phenomenon of wrapped ball and improving the grinding efficiency. Especially in fine grinding pure clinker cement, the effect of water spraying in grinding is more remarkable. When the clinker reaches a temperature of more than 80 DEG C, spraying 1% to 1.5% of the atomized water into the mill can reduce the temperature of the grinding cement by 15% to 20%, and the output of the pure clinker can be increased by 5% to 10%. The temperature in the mill decreases and the dehydration of the gypsum is avoided, thus ensuring the quality of the cement.
Water spraying is usually limited to grinding bins, but if the clinker reaches a temperature of more than 80 DEG C, water can be injected into a warehouse, so that the temperature of a silo is not more than 110 degrees centigrade. I will introduce the use of our factory.
Working principle: at the discharge end, the injection of water is controlled by the cement temperature (MOIT3); the feed end is controlled by the temperature of the water shield (MOIT1). The following are stated below:
The cement temperature (MOIT3) is measured by the thermocouple at the outlet of the mill. After the signal is amplified, and the regulator (PIU) compares the adjustable reference signal, if there is a difference between the two signals is open or close in water valve (K04), until the cement temperature has required evaluation so far.
Water cover plate temperature (MOIT1) by the mill covered platinum resistance water plate pipe in the measurement of the regulator (PII), the signal is compared with an adjustable reference signal, the tw
您可能关注的文档
最近下载
- 危险化学品生产经营单位安全管理.pptx VIP
- DBJ33_T 1283-2022顶管工程技术规程.pdf VIP
- 《防止电力建设工程施工安全事故三十项重点要求》宣贯与解读.pdf VIP
- 新能源汽车高压安全操作规范.pptx VIP
- 吉利汽车财务报表分析.docx
- 2024年中考语文试题分项汇编:词语运用(第03期)(解析版).pdf VIP
- SMW工法围护桩监理实施细则[全面]范本.doc VIP
- 浅谈市政工程项目成本控制开源与节流.doc VIP
- 最新人教版数学一年级下册第七单元《7.3 数量关系》教学课件(2025年春-新教材).pptx VIP
- 2024年中考语文一轮专题复习:图文转换 专项练习题(Word版,含答案).docx VIP
文档评论(0)