水工建筑物知识点(Water works building knowledge point).docVIP

水工建筑物知识点(Water works building knowledge point).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水工建筑物知识点(Water works building knowledge point) Chapter v sluices 1. The sluice gate is a low-water head building that can hold water and drain water to adjust the water level and control the discharge flow. The sluice gate is divided into the water gate, the sluice gate, the sluice gate, the sluice gate, the sluice gate and the sluice gate. According to its structure type: open type and closed water gate. 2. The components of the sluice gate: the gate chamber, the upstream connection section, and the downstream connection three groups. The main function of the chamber is to control the water flow and to connect the two sides. It includes gate, gate, floor, chest wall, work bridge Traffic bridge, etc. The function of the brake pier: separate the brake hole and support the superstructure. Upstream connection: guide water flow smoothly into the gate chamber, protect upstream riverbed and Banks from scour, and have anti-seepage use. Downstream connecting segments: the main function is to eliminate the seepage flow through the gate and the two Banks. 3. The influence factors of brake hole design include brake hole type and gate height. 4. Underground contour line: impermeable bedding, sheet pile and foundation contact line, which is the first of the seepage of the sluice Streamline, its length is the anti-seepage length of the brake base. L CH 5. Calculation purpose of the seepage flow of the gate: to solve the seepage pressure and infiltration slope, and to verify the initial drawing and drainage Whether the layout meets the requirements. The methods of calculation include: flow network method, linear method, improved coefficient method of negative force, finite element method and test method. The straight line method assumes that the seepage flow is the same as the slope of the contour of the foundation, that is, the head loss is changed in a straight line. 6. Anti-seepage facilities of sluices include; Horizontal anti-seepage (blanket), vertical anti-seepage (sheet p

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档