水泥混凝土路面面层施工工艺(Construction technology of cement concrete pavement).docVIP

水泥混凝土路面面层施工工艺(Construction technology of cement concrete pavement).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水泥混凝土路面面层施工工艺(Construction technology of cement concrete pavement) Construction technology of cement concrete pavement Date: [2006-9-1] The construction process of the concrete slab is to install the template, install the transmission rod, concrete mixing and transportation, concrete spreading and vibrating, surface finishing, joint treatment, concrete curing and filling. 1. Installation template The template should be used for steel, bend and other non-standard parts and small works. Template should have no damage, have enough strength, medial and top and bottom surface should be smooth, level off, suitable straight, local deformation shall not be greater than 3 mm, when vibrating template transverse maximum deflection should be less than 4 mm, height should be consistent with the concrete pavement slab thickness, error is not more than plus or minus 2 mm, longitudinal seam template flat seam eye rod perforation should be accurate, tongue-and-groove seam is the enterprise department of breath or groove length error was plus or minus 1 mm steel template, wooden template plus or minus 2 mm. 2. Set up a link When the side die is installed, it is necessary to install the transmission rod position on the position of the transmission lever. When the concrete slab is poured continuously, it can be used to set up the transmission rod. Namely garden reserved hole on the sealing board, so that the dowel bar through the sealing plate above the wooden or iron pressure cracks batten, dowel bar according to the location and spacing, inverted u-shaped groove at the bottom of the seam template make it, make the dowel bar resulting by the ends of the dowel bar fixed on the bracket, bracket foot in grassroots. When the concrete slabs are not continuously poured, it can be used as the rod for the fixed method. That is to add a positioning template on the outside of the end template, which is according to the spacing of the bar and the diameter of the rod and the hole of the hole, and

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档