梁柱节点混凝土的施工(Concrete construction of beam column joint).docVIP

梁柱节点混凝土的施工(Concrete construction of beam column joint).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
梁柱节点混凝土的施工(Concrete construction of beam column joint) Between the construction of.Txt concrete beam column joints of the two peoples feelings like knitting a sweater, a glimmer, careful and long, when the demolition of lightly.... Beam column joints concrete construction,.Txt husband, if you can only live in a day, I would like to use my life to continue your life, you want to live happily, in the proposed breakup, please do not say you still love me. Concrete construction of beam column joint 1 beam column joints common construction method of concrete with different strength grade in 1.1 retaining the adjacent surface of different grades of concrete In the reinforced concrete structure, beam column joint of frame structure of the high-rise building is more complicated, because the load combination and internal force calculation results, the vertical structure required the same layer (column, wall) concrete strength level higher than the level structure (beam, plate) of the concrete strength grade. Reinforced concrete frame structure, horizontal construction joints usually stay in the column, column to stay horizontal construction joints shall be left at the bottom of beam. If the same layer of the vertical component and the horizontal component of the concrete pouring is not at the same time, the construction joints left. In Construction of 1.2 beams and columns of different strength grade concrete pouring According to the high-rise building most commercial concrete mixing station or pump pouring the concrete, beam column joint core vibration method is shown in Figure 1, whether or not to stay top construction joints left, should be the first tower crane bucket or concrete pump conveying column grade concrete in layer vibration, in 45 degree inclined floor beam Banchu set. Before concreting, the concrete is then pumped into the floor slab. By this method, pouring floor columns, walls, beams and slabs of concrete, should not focus on the control of adjacent surface

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档