34、预应力后张法张拉施工工艺标准(434-1996)(34, prestressed tensioning method of construction standards (434-1996)).docVIP

34、预应力后张法张拉施工工艺标准(434-1996)(34, prestressed tensioning method of construction standards (434-1996)).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
34、预应力后张法张拉施工工艺标准(434-1996)(34, prestressed tensioning method of construction standards (434-1996)) Construction technique standard of post tensioned tensioning (434-1996) 1, scope This technology standard is applicable to the construction of the prestressed tension of the prestressed concrete in the field of general industry and civil construction (excluding the manufacture of components and blocks). 2 、 construction preparation 2.1 materials and main equipment 2.1.1 prestressing tendons: the varieties, specifications and diameters of the heat treated steel bars, steel wires and strands must be in line with the design requirements and national standards, and the factory quality certificates shall be submitted for repeated tests. Cold drawing I, II and III reinforced steel should also have a mechanical test report after cold drawing. Anchor, fixture and connector for 2.1.2 tendons in the form of rules should be consistent with the design and application of technical requirements, should have the certificate, to enter the construction site should be according to the concrete structure engineering construction and acceptance norms (GB50204? 2) static load test shall be carried out inspection and assembly. 2.1.3 the cement used for grouting shall not be less than 425, ordinary portland cement or selected as required by the design, and the factory certificate and retest report shall be adopted. 2.1.4 main machines are: hydraulic drawing machine, electric high-pressure oil pump, grouting machine, test mold, etc.. 2.2 operating conditions 2.2.1 tensile prestressing machine has been checked and recorded. The test run shall check whether the tensioning tools and equipment are normal and reliable. If any abnormal conditions are found, they shall be repaired before they can be used. The filling machine is ready. The strength of 2.2.2 concrete members (or blocks) must meet the design requirements and should not be less than 75% of the design strength when the design is not req

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档