- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
307可挠金属电线管敷设施工工艺(307 flexible metal wire laying process)
1 range
This technology is applicable to general industrial and civil engineering 1kV and the following lighting, power, weak flexible metal wire and pipe laying and the bright and dark ceiling and dado in flexible metal wire and pipe laying engineering (i.e. prica tube).
2 construction preparation
2.1 material requirements:
2.1.1 flexible metal wires, pipes and their accessories shall conform to the relevant regulations of the current national technical standards, and shall have certificates of conformity. Fire proof should also be given by local fire department.
2.1.2 flexible metal wire and tube clamps, brackets, hangers, boxes, boxes and other fittings and accessories shall be used in wiring engineering, galvanized or paint.
The specifications and models of 2.1.3 flexible metal wires, pipes and accessories are in line with the requirements of the state regulations and design requirements.
2.1.4 other materials needed: wire pipe, junction box, lamp box, socket box, distribution box, junction box connector, mixed pipe joint, a locking nut, a fixing clip, grounding clip, round steel, flat steel, angle steel, bracket, rod, bolts and nuts, washers, spring washers, bolts, wood screws, self tapping screws and other metal parts shall be galvanized or antirusted.
2.2 main machines and tools:
2.2.1 flexible metal wire and pipe cutter, hydraulic perforator, toothless saw, bench drill, electric drill, electric hammer, electric welder, nail gun.
2.2.2 hacksaw, wrenches, pliers, hammer, chisel, fishtail drill, semi-circular file, pliers, screwdriver, electric knife etc..
2.2.3 horizontal ruler, square, ruler, pencil box, wire, ash bucket, ash shovel, noodle bag etc..
2.3 operating conditions:
2.3.1 laying of concealed pipe:
2.3.1.1 with the concrete structure of the laying of underground construction, according to the design drawings requirements, in the steel lashing, concrete pouring pipe stability box, buried pieces,
您可能关注的文档
- 《考工记·匠人营国》原文及翻译(Kao Gong Ji, the original text and the translation of business builders).doc
- 《空间两条直线的位置关系2》教学设计与反思(Teaching design and Reflection on the positional relation of two straight lines in space 2).doc
- 《画画我们的校园》(Painting our campus).doc
- 《历史与社会》七年级上册复习提纲(History and society seven grade review outline).doc
- 《六言杂字》全文(Six words the magazine).doc
- 《南唐二主词新释辑评》(The two subject new anthology).doc
- 《难忘的一躬》阅读理解及答案(Reading, understanding and answers to an unforgettable bow).doc
- 《你,浪花里的一滴水》说课稿(You, a drop of water in the spray).doc
- 《诺曼底号遇难记》教学设计2-免费教案(The teaching design of 2- in Normandy, a free lesson plan).doc
- 《女生宿舍》歌词(Girl's dormitory lyrics).doc
文档评论(0)