大型混凝土和高层建筑后浇带的设置与施工质量控制(Setting up and construction quality control of large concrete and high rise building after pouring).docVIP

大型混凝土和高层建筑后浇带的设置与施工质量控制(Setting up and construction quality control of large concrete and high rise building after pouring).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大型混凝土和高层建筑后浇带的设置与施工质量控制(Setting up and construction quality control of large concrete and high rise building after pouring) Large high-rise buildings and concrete pouring belt design and construction quality control of.Txt Ming Sao is easy to hide, dark base to prevent. The Buddha said: you are silly B! When during the day and a night to turn on the bed, the sun was born in large concrete and high-rise building after setting and cast concrete construction quality control On the post cast band... content The station search more about the post cast band position content AI Qun Chen [Abstract] in this paper after pouring quality problems with construction, combined with the standard requirements and the practical work experience of large buildings and high-rise building post cast band and construction quality control and puts forward some corresponding measures. [keyword] post cast band quality control Summary: after pouring zone as treatment measures have been widely used, and the settlement and expansion of large concrete high-rise building. After pouring belt according to the use function can be divided into two types: to solve the uneven ground settlement is called the settlement post pouring belt, mainly used in high-rise building for the differential settlement between the solution and the podium set is used to solve the structure; due to the temperature difference caused by shrinkage deformation is called shrinkage after pouring, mainly used to solve the structure of large volume concrete, shrinkage deformation and long setting. After pouring belt can not arbitrarily set, its location should be according to the design requirements and specification and construction scheme in advance determine bearing capacity, according to the different foundation structure to determine the different processing methods. But there are individual projects on the indwelling pouring there at random, there are lack of construction technology, quality control is not strict etc.. If yo

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档