大型深基础施工方案和施工组织(Construction plan and construction organization of large deep foundation).docVIP

大型深基础施工方案和施工组织(Construction plan and construction organization of large deep foundation).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大型深基础施工方案和施工组织(Construction plan and construction organization of large deep foundation) Scheme of deep foundation construction organization design of a special school A compilation basis: 1, design and construction drawings. 2, the geological survey report 3, foundation and foundation acceptance specification JGJ120-99 support for 4, building foundation pit 5, construction safety inspection standards JGJ59-99 Two project overview A new school campus is located in Jiangxi city of Xinyu Province Economic Development Zone on the north side of a highway, South Campus, South East of Dongxing Skyway Avenue, North Road, north of an expressway, this project is a new school campus stands. Xinyu city is located in the Dongxing high tech Development Zone north of the west, the project by the Design Institute of design of a building. The total construction area of 2782 square meters respectively, the first layer is 3.6m, the total length is 136.5m, width of 13.95m, the project for the frame structure. Three, construction preparation 1, the engineering survey according to the owners to provide coordinates and elevation control points, combined with the general layout and construction layout drawing, establishment of plane control network and elevation control network in the engineering detection. 2, the scene of the plane control surveying using closed precision theodolite, the elevation control level, according to the tentative, precise and complex test procedures, to ensure that the axis coordinates and elevation points coincide. 3, all the instruments and the ruler must be in use before the measurement and identification, inspection qualified rear can use. 4, according to the design and construction requirements, construction area of three connections and one leveling work. Based on using mechanical excavation, all earthwork sinotrans. 5, do the measurement line work. The range is not influenced by the foundation, set the measurement control network. Including the axis and l

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档