DESIGN OF PILES AND PILE GROUPS (设计桩和桩组).pdf

DESIGN OF PILES AND PILE GROUPS (设计桩和桩组).pdf

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
DESIGN OF PILES AND PILE GROUPS (设计桩和桩组)

DESIGN OF PILES AND PILE GROUPS CONSIDERING CAPACITY, SETTLEMENT, AND NEGATIVE SKIN FRICTION Bengt H. Fellenius, Dr.Tech., P.Eng. Background Notes for Demo Example for UniPile at Updated 1999 Introduction Current practice for pile design varies and building codes differ between countries as well as within countries, indeed, even between individual engineering disciplines. The differences do not become apparent until the designer includes the effect of dragload and settlements: In reference to the structural strength of the pile, many do realize that the maximum load in a pile is the sum of dead load and dragload; live load does not add to the maximum load. Others, however, will consider the dragload as just another load and lump it in with the dead and live loads. In reference to the bearing capacity, some will even determine the factor of safety as the pile bearing capacity divided by the sum of the dead and live loads and the dragload! Or worse, as really has occurred by some twisted logic, first subtract the dragload from the bearing capacity and then divide the balance by the sum of the dead and live loads and the dragload. The correct approach is that the dragload is not to be included in the calculation factor of safety on bearing capacity. The factor of safety is simply the bearing capacity divided by the dead and live loads. Actually, the larger the dragload the stiffer the pile and the safer the design (provided the structural strength is sufficient). Settlement calculations are rarely performed when designing a ordinary pile group. When it is, the methods of calculation range from those using simple

您可能关注的文档

文档评论(0)

wnqwwy20 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:7014141164000003

1亿VIP精品文档

相关文档