发电厂主厂房超长结构温度效应的弹塑性分析 elastoplastic analysis on temperature effect of extra-long frame for main power house
第31卷第7期 电 力 建设 、,01.31,No.7
PowerConstruction
2010年7月 Electric Jul,2010·1·
中图分类号:TU271.1。TU313文献标志码:A文章编号:1000—7229{2010)07.0001.04
发电厂主厂房超长结构温度效应的弹塑性分析
方伟定1,童建国1,王学民1,张爱晖2
(1.浙江省电力设计院,杭州市,310012;2.浙江大学结构工程研究所,杭州市,310058)
on Effect
of Framefor
ElastoplasticAnalysisTemperatureExtra‘_。long
MainPowerHouse
您可能关注的文档
- 二滩水电站地下厂房结构和机组振动分析 analysis on structure of underground power house and vibration of generating unit in ertan hydropower station.pdf
- 二维bagging集成支持向量机进行网络故障诊断 applying 2d-bagging ensemble method of support vector machines to network fault diagnosis.pdf
- 二瓦特计测量法的读数与无功功率的计算公式 readings of two-wattmeter measuring method and calculating formula of reactive power.pdf
- 二维短沟道mosfet阈值电压分析模型 analysis of 2-d short-channel mosfet threshold voltages model.pdf
- 二维多导体柱电磁散射特性的特征基函数法分析 em scattering analysis of 2-d multiple conducting cylinders using characteristic basis function method.pdf
- 二维各向异性椭圆柱的电磁散射 scattering by a homogeneous anisotropic elliptic cylinder two-dimensional case.pdf
- 二维激光扫描演示实验系统设计 design of the demonstration experiments of two-dimensional laser scanning system.pdf
- 二维密集导体目标散射的数值模式匹配法 numerical mode match method for scattering computation of densely distributed 2d pec targets.pdf
- 二维经验模态可分离度及其量化计算 the bidimensional empirical mode detachable degree and its quantum calculation.pdf
- 二维离散小波变换的fpga实现 fpga implementation of 2d discrete wavelet transform.pdf
- 发电厂主汽温系统的模糊滑模控制研究 fuzzy sliding mode control for main steam temperature system in power plant.pdf
- 发电厂综合管架的布置研究 study on overhead pipelines arrangement in thermal power plant.pdf
- 发电电动机的安全稳定运行 safe and stable operation of generator-motor.pdf
- 发电电动机的安全稳定运行.pdf
- 发电电动机滑环发出响声的原因分析.pdf
- 发电厂仪用压缩空气联络运行的试验研究与节能分析 test research and energy-saving analysis on combined operation of compressed air used for instruments in power plants.pdf
- 发电工程设计服务管理研究及对策 study & countermeasure on whole process service management of power plant project design.pdf
- 发电公司的合作竞价策略研究 study on the cooperative bidding strategy of power company.pdf
- 发电公司容量信用最优交易量确定方法 determination of optimal capacity commitment in capacity market.pdf
- 发电公司与供电公司联合实施可中断负荷的优化模型 study on the optimal model of interruptible loads implemented by power generation and supply company.pdf
原创力文档

文档评论(0)