发电机定子冷却水超净化装置在连城电厂的应用 application of super purifying system of cooling water of generator stator in liancheng power plant.pdfVIP
- 3
- 0
- 约 4页
- 2017-08-13 发布于上海
- 举报
发电机定子冷却水超净化装置在连城电厂的应用 application of super purifying system of cooling water of generator stator in liancheng power plant
华北电力技术 NoRTHCHINAELECTRICPowER 25
·新技术应用·
发电机定子冷却水超净化装置在连城电厂的应用
李三勇,张福祥
(甘肃大唐国母连城发电有限责任公司,甘肃连城730332)
摘要:连城电厂3、4号机组白投运以来,定冷术的合格丰很低,其中以铜离子鲁量和pH起标最为严重。采用
超净化裳王处理定冷水,水质得到明星改善,合格率有了很大提高,水质监洲敷据基本达到要求。
关键词:定冷术;水质舟析;净化处理{定电机
中盈分类号:TM621.8文献标识码:B 文章编号t1003—917l(2007)10—0025—04
of ofCoo¨ng
ApplicationSuperPurifyingSystem
Plant
WaterofGeneratorStatorin Power
Liancheng
LiSan—yong,ZhangFu—xiang
IntermtionalPowerGeneration 730332,China)
(Gansu Co.Ltd.,Liancheng
Data“g Lianche“g
andof PowerPlant havelow rateofstator water
Abstr毗t;Unit3 4 Liancheng alway8 qualification cooling
is
excessiveioncontentand valuemore3盯ious.
since were into copper pH
they put operation,especially
water water and rate
wasusedinstator treatment,thequality
Super system cooling quaIificatlon
pllrifying
mea8uredwater datais thestandard.
are
improvedobviously,the quality meeti“g
word$:statorwaterlwater a衄lysi8;ptlrlfy}generator
Key c001ing quality
1系统简介 2 内冷水系统腐蚀因素分析
甘肃大唐国际连城发电有限责任公司(简 (1)pH对铜在水中腐蚀的影响
称连城电厂)两台2×300Mw机组,发电机冷 pH在6.95以下区域,出现cu”,即铜的腐蚀
却方式为水一氢一氢,定子绕组采用水内冷方式, 区;pH在7.o~8.o,铜腐蚀有一定减缓,pH为
定冷水系统是独立而封闭的循环系统。两台机 8.o~9.o时,铜腐蚀基本被抑制。
如图1、图2
您可能关注的文档
- 发电厂ups系统的设计探讨.pdf
- 发电厂vrla蓄电池运行维护分析 analysis of operation and maintenance of vrla battery in power plant.pdf
- 发电厂vrla蓄电池运行维护分析 operation and maintenance of vrla battery for power plant.pdf
- 发电厂备用电源自投成功率分析 analysis of success probability of bzt in power plant.pdf
- 发电厂保温外护工艺探讨 discussion on heat preservation and outside protection technics in power plant.pdf
- 发电厂变频设备的谐波分析 harmonics analysis on inverter device of power plant.pdf
- 发电厂标识系统综述和选择原则探讨 selection principle and summarize identification system for power plant.pdf
- 发电厂5吨36米装卸桥主要构件的疲劳寿命评估 the fatigue life assessment of the shipping bridge in the power plant.pdf
- 发电厂并网考核与辅助服务补偿细则评价指标体系 an evaluation system for two regulations on power plant operation assessment and ancillary service compensation.pdf
- 发电厂并网运行与辅助服务评价系统的构建 construction of evaluation system of power plant grid-connected operation and auxiliary services.pdf
- 2025-2026学年天津市和平区高三(上)期末数学试卷(含解析).pdf
- 2025-2026学年云南省楚雄州高三(上)期末数学试卷(含答案).pdf
- 2025-2026学年甘肃省天水市张家川实验中学高三(上)期末数学试卷(含答案).docx
- 2025-2026学年福建省厦门市松柏中学高二(上)期末数学试卷(含答案).docx
- 2025-2026学年广西钦州市高一(上)期末物理试卷(含答案).docx
- 2025-2026学年河北省邯郸市临漳县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省石家庄二十三中七年级(上)期末历史试卷(含答案).docx
- 2025-2026学年海南省五指山市九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省唐山市玉田县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省邢台市市区九年级(上)期末化学试卷(含答案).docx
原创力文档

文档评论(0)