网站大量收购独家精品文档,联系QQ:2885784924

Concrete Slab Drying Shrinkage Cracking (混凝土板干燥收缩开裂,).pdf

Concrete Slab Drying Shrinkage Cracking (混凝土板干燥收缩开裂,).pdf

  1. 1、本文档共3页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Concrete Slab Drying Shrinkage Cracking (混凝土板干燥收缩开裂,)

CEMEX USA - Technical Bulletin 7.0 Concrete Slab Drying Shrinkage Cracking What is it, why does it occur, and how can the potential be minimized? What is concrete slab drying shrinkage cracking? When concrete is placed; typically that concrete contains more water than is required to hydrate the cementitious materials the mixture contains. This excess water, or water of convenience; is for workability and placement purposes. Most of this excess water begins to exit the concrete during placement/curing and causes the concrete to shrink. While the concrete is shrinking, many things such as reinforcement or the subgrade restrain the concrete. This restraint creates tensile stresses in the concrete slab which in turn may produce drying shrinkage cracking. Concrete slab drying shrinkage cracking can be the unfortunate end result of a combination of factors related to material choices, construction planning, placement, and curing periods. Knowledge of these types of contributing factors is half the battle. Why does it occur? There are numerous factors that may cause the phenomenon of slab drying shrinkage. The contributing factors include, but are not limited to: 1. Use of wrong concrete mixture design 2. Excess water in lieu of the mixture design requirements 3. Excess water added on the jobsite 4. Improper subgrade preparation (compaction, moisture content, etc.) 5. Rapid evaporation of moisture from the slab during placement and curing 6. Improper use of reinforcement 7. Lack of or improper placement of control joints 8. Insufficient timing of saw cuts 9. Insufficient saw cut depth 10. Improper finishing techniques 11. Lack of curing or improper curing techniques

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档