DESIGN OF CONTAINER YARD AT PORT OF (在港口集装箱堆场的设计).pdfVIP

DESIGN OF CONTAINER YARD AT PORT OF (在港口集装箱堆场的设计).pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
DESIGN OF CONTAINER YARD AT PORT OF (在港口集装箱堆场的设计)

DESIGN OF CONTAINER YARD AT PORT OF BALBOA Carlos E. Ospina, PhD, PE, MASCE; 1 Viswanath K. Kumar, PE, MASCE; 2 and 3 Jorge Puente, PE, MASCE 1Senior Project Engineer, BergerABAM, 2000 South Dairy Ashford Street, Suite 300, Houston, TX 77077; PH (281) 940-6420; email: carlos.ospina@ 2Vice President, BergerABAM, 33301 Ninth Avenue South, Suite 300, Federal Way, WA 98003; PH (206) 431-2335; email: vk.kumar@ 3Senior Project Manager, Panama Ports Company; Arnulfo Arias Madrid Avenue, Bldg 1501, Balboa, Panama; PH (507) 207-5241; email: puente.jorge@.pa ABSTRACT Committed to converting the Port of Balboa into a major transshipment hub, Panama Ports Company (PPC) launched in 2006 a $300-million expansion program to increase berthing and stacking space that would almost triple the port capacity. The site’s history of marine-related activities, deteriorating facilities, buried structures, and poor soils mandated significant investment in clearing and preparation. Of the 25-hectare container yard to be built, about 15 hectares were dredged to remove poor soils and reclaimed by filling/compacting with imported sand. Ground conditions in a 5-hectare area were also improved by a wick drain and surcharge program. Most container yards in North America are built with continuous asphalt or jointed portland cement concrete (JPCC) pavement. However, the Balboa yard features a discrete paving system for container stacking that is suited for rubber-tire gantry (RTG) crane operations. It consists of narrow reinforced concrete (RC) beams (serving as container bases) with a thin asphalt sealed crushed rock base around them. Support for the RTGs consists of continuous j

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档