兰大《土木工程施工》13春在线作业1(Landa civil engineering construction 13 spring online job 1).doc

兰大《土木工程施工》13春在线作业1(Landa civil engineering construction 13 spring online job 1).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
兰大《土木工程施工》13春在线作业1(Landa civil engineering construction 13 spring online job 1)

兰大《土木工程施工》13春在线作业1(Landa civil engineering construction 13 spring online job 1) Spring 13, autumn, civil engineering construction 13 spring online job 1 Total score: 100 test time: -- Single topic selection Multiple choice True or false (a total of 15 questions, 30 minutes.) 1. A natural soil with a weight of 100g and a weight of 85 g after drying. The water content of the soil sample is (). A. 10% B. 15% 17.6% C. D. 20% Full mark: 2 2. There are both outgoing arrow lines and inward arrow line segments in the double codename network () A. starting node End node C. Intermediate node D. Any node Full mark: 2 3. The construction joints of underground waterproof concrete shall remain in the wall, and should not be less than the entrance of the wall. A. 200 mm B. 300 mm C. 400 mm D. 500 mm Full mark: 2 4. The construction sequence of large blocks of granite or marble is () A. Temporary fixation, fine stone concrete, flat surface B. Concrete-filled concrete, temporary fixation, flat surface C. Temporary fixation, flat surface and fine concrete D. Flat surface and fine stone concrete - temporary fixation Full mark: 2 5. When the roof slope is less than 3%, the paving of asphalt waterproof rolling material should be suitable (). A. Parallel to the roof B. Perpendicular to the roof C. It has a 45-degree Angle to the roof The lower layer is parallel to the roof and the upper part is perpendicular to the roof Full mark: 2 6. In addition to the construction plan, technical organization measures, plane layout and other design requirements for bidding and signing, the contents of the design of the pre-standard construction organization shall be () A. construction schedule B. Plan to reduce the cost C. Resource requirements plan D. Analysis of technical and economic indicators Full mark: 2 7. If the construction site is not required to be replaced by the drawing, it should be noted that the rebar should be approved () A. General contractor for construction B. design unit C. unit g

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档