- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
判断 首字母汇 高级工(Judge the first letter to the senior engineer)
判断 首字母汇 高级工(Judge the first letter to the senior engineer)
A:
1: wrong. The voltage loss is allowed to lose the primary low-voltage cable section.
2: thats right. The installer should be able to use the installation tool correctly, live spanner, pipe clamp, etc. No longer sleeve, longer arm, no substitute for hand hammer.
3: wrong. The equipment installed must be tested in accordance with the test items specified in the electrical test procedure. The test is not qualified and can be used.
4: wrong. There is no need to strictly enforce the stop power system during installation
May: thats right. When the explosion-proof equipment is installed, it is necessary to protect the explosion-proof surface and prohibit the use of the equipment to make the worktable so as to avoid damaging the equipment. After installation, it should meet the explosion-proof performance requirement.
6: the manual component movements of the installation equipment can be used without special flexibility.
B:
1. Correct: the transformer can transform the alternating voltage of a numerical value to the same frequency and the varying voltage.
In addition to changing the alternating voltage, the transformer can change the alternating current, change the phase, and change the impedance.
3: to: bkd1-500/1140 (660) : after the relay of the leak-type vacuum feeding switch of the mine is completed, press the reset button and the vacuum feed switch allows the closing of the switch.
The range of the length of the semiconductor tripper is 0.4 ~ 1 times that of the rated current
5: wrong: trip semiconductor overvoltage protection device: feeder switch UVW arbitrary sta access resistance capacity device respectively, when the grid appear overvoltage, to eliminate overvoltage by resistance capacity to absorb the harm of lines.
6: wrong: rake bucket of scraper type reloader return resistance large, return roller is faster than working drum.
C:
1: the CPU is the core component of PLC, which accepts processing info
您可能关注的文档
- (MTT498—1995) CKJ系列交流真空接触器维修检验技术规范((MTT498-1995) CKJ series ac vacuum contactor maintenance test technical specification).doc
- (上海财大)公共经济与管理学院及相关专业简介((Shanghai finance and economics) public school of economics and management and related majors).doc
- (文科20题)已知抛物线 ,圆(We have a parabola, a circle).doc
- (蕨菜)茶((bracken) tea).doc
- 001人工挖土施工工艺(The construction technology of artificial excavation).doc
- 013福师《管理学概论》在线作业二(第5次)(013 fu shi introduction to management online homework 2 (5th)).doc
- 04.行车闭塞07-04-01(04. The traffic is closed at 07-04-01).doc
- 040430太阳风暴-何香涛(040430 solar storm - ho xiangtao).doc
- 05试卷(05 papers).doc
- 04可摘要点(04 abstract points).doc
- 2025AACR十大热门靶点推荐和解读报告52页.docx
- 财务部管理报表.xlsx
- 高中物理新人教版选修3-1课件第二章恒定电流第7节闭合电路欧姆定律.ppt
- 第三单元知识梳理(课件)-三年级语文下册单元复习(部编版).pptx
- 俄罗斯知识点训练课件-七年级地理下学期人教版(2024).pptx
- 课外古诗词诵读龟虽寿-八年级语文上学期课内课件(统编版).pptx
- 高三语文二轮复习课件第七部分实用类文本阅读7.2.1.ppt
- 高考物理人教版一轮复习课件第4章第3讲圆周运动.ppt
- 高考英语一轮复习课件53Lifeinthefuture.ppt
- 2025-2030衣柜行业风险投资发展分析及投资融资策略研究报告.docx
文档评论(0)