塔台配置(Tower configuration).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
塔台配置(Tower configuration)

塔台配置(Tower configuration) Air traffic control equipment configuration for civil aviation airport tower 1 scope This standard provides for the configuration of air traffic control (hereinafter referred to as the air traffic control) equipment of civil aviation airport tower. This standard is applicable to air pipe equipment configuration of various civil aviation airport tower. 2. Type of tower air pipe equipment configuration 2.1 the allocation of tower air pipe equipment is divided according to the average takeoff and landing of the airport in the tower, as shown in table 1. An average of 2.2 days of landing plus time refers to the existing statistical actual landing sorties, average, for the new, expanded tower, should refer to five years is expected to reach the most flights, or should be consistent with airport general requirements. 3. Configuration principles 3.1 the configuration of the tower equipment shall be based on the need of the air pipe and the development scale of the airport operation quantity to ensure the safety and convenient use. 3.2 this standard provides for the necessary configuration of tower air pipe equipment, and the redundancy of the equipment can be considered as needed. The general requirements of tower control room and equipment room The tower control is the work place for the control of tower flight control, and the tower equipment room is the machine room for the tower, which can be combined into one or the other, and can be separated according to the need. 4.2 airport lighting inside and outside, reflectors, and other facilities should not affect tower controllers of observation, avoid the plane taxiing, take-off and landing of the influence of noise on the tower control room work environment. 4.3 the window around the tower control room should be tilted outward around 150, in order to avoid to the apron, the runway, taxiway and landing strip produce glare, tower verandah ground should be lower than tower control room 1 m above the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档