- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工放线(工地实用)(Construction release (site utility))
施工放线(工地实用)(Construction release (site utility))
Stringing technique
Building construction line laying out is one of the basic skills of construction management personnel. Every construction project starts with the construction and positioning of the building. It concerns the success or failure of the whole project. The phenomenon of dislocation of houses due to line errors can not meet the requirements of functional facilities. Construction line laying out is a vital link to ensure the quality of the project. The following discussion of building construction survey wire laying technology.
1 general rectangular building Stringing Technology
The first step is the construction of line 1.1 coordinate location planning review general construction plan drawn by the planning, technical personnel and site positioning, planning positioning is the theoretical value of the actual position and the building site is different, must check and correct. As of 2005 by the company to undertake the construction of Guangxi Duan County Peoples government office building project, according to the planning of fixed line, a long arc dislocation 100cm, unable to agree. Because the area is large, size, with the coordinate design theory error, design corrections, re planning points, to put on the line, the square outside connected with not only consistent, according to the actual adjustment right, which lasted more than 10 days to correct. The need to put the correct positioning of the line engineering construction company and the Education Bureau of Hechi city residential building, Jinchengjiang food company residential buildings and so on, it can not be fully in accordance with the planning point on the line and to determine the location of the intention of comprehensive design, according to the actual situation of the scene, and the control points to draw out the building outside, protect the pile position.
The 1.2 and second step is to determine
Building axis and elevation. The conventiona
您可能关注的文档
- 施工的工艺流程(Construction process).doc
- 旅游知识问答(Travel quiz).doc
- 施工放线之内控法怎样操作施工放线之内控法怎样操作(How to operate the internal control method of construction line and how to operate the internal control method).doc
- 旅游网络公共关系营销探索(Exploration of public relations marketing in Tourism Network).doc
- 旅游规划应着力的八个要点(Eight points to be stressed in tourism planning).doc
- 施工残忆(Construction remnant).doc
- 无心磨床加工的磨削缺分析(Analysis of grinding loss in centerless grinding machine).doc
- 无损检测标准一览表(List of standards for nondestructive testing).doc
- 无比打字口诀(Very typing formulas).doc
- 施工过程中干扰源的产生和解决(Generation and resolution of interference sources during construction).doc
文档评论(0)