- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
框架设计易被忽视的问题和解决措施(Easily neglected problems and solutions of frame design)
框架设计易被忽视的问题和解决措施(Easily neglected problems and solutions of frame design)
Easily neglected problems and solutions of frame design
Summary of recent projects done by myself, there are some experience for your reference.
I want to expand this article and write a promotion paper. I wonder if I can You are welcome to make more comments, please note that there are inadequacies!
(I) structural problems
1., the trench depth is greater than the base depth, at this time the foundation should be deepened;
When a layer of filler wall thickened by ground bearing, trench should deepen or lintel;
When the foundation pull beam is located at + 0, the trench should be deepened so as to avoid the beam height.
When the 2. layers high, should not use the way of filling wall thickening ground bearing, to prevent cracks caused by the deformation coordination, are advised to set up the fundamental beam, small deformation (when the opening is not in the side, due to the impact, columns and wing wall at this time is actually the wall beam model). When the span is large, the pier can be placed in the middle of the tension beam to solve the deformation.
3. the connection between the infill wall and the main structure is not specified. The concrete can be referred to the 13 chapter of the seismic code (non structural component) or 02SG614 (frame structure filled with small hollow block wall structure).
4. review column minimum stirrup ratio, beam negative reinforcement into the side column, whether more than 0.4LaE on the frame beam torsion awning main reinforcement and stirrup ratio is more than enough 0.28ft/fy.
5. stair board upper reinforcement should lower ribs 0.5 ~ 0.67, and more than 200 people @ Phi 8, up and down the same reinforcement is not reasonable; the landing beam column should not be connected with the upper frame beam, are connected to form a small internal frame, frame beams with complex, small column tension and the column section, amounting to 300, should take the strengt
您可能关注的文档
- 施工放线(工地实用)(Construction release (site utility)).doc
- 施工的工艺流程(Construction process).doc
- 旅游知识问答(Travel quiz).doc
- 施工放线之内控法怎样操作施工放线之内控法怎样操作(How to operate the internal control method of construction line and how to operate the internal control method).doc
- 旅游网络公共关系营销探索(Exploration of public relations marketing in Tourism Network).doc
- 旅游规划应着力的八个要点(Eight points to be stressed in tourism planning).doc
- 施工残忆(Construction remnant).doc
- 无心磨床加工的磨削缺分析(Analysis of grinding loss in centerless grinding machine).doc
- 无损检测标准一览表(List of standards for nondestructive testing).doc
- 无比打字口诀(Very typing formulas).doc
- 桥涵水文总复习题(Review of hydrological problems for bridges and culverts).doc
- 校直机系列产品(Straightening machine series products).doc
- 桥涵单选题(Bridge and culvert radio problem).doc
- 桥牌规则说明(Rules of bridge).doc
- 校验邮箱格式(Check mailbox format).doc
- 梁祝论文(The Butterfly Lovers).doc
- 梅兰芳艺术特点(Mei Lanfang art features).doc
- 梦三国推荐人(Dream three referees).doc
- 梦幻刷成就攻略(Dream brushes).doc
- 棉被的鉴定方法(Identification methods of quilts).doc
最近下载
- 中国移动2018年校园招聘考试笔试题目考试试卷-历年考试真题.doc VIP
- 基础会计洑建红习题答案(新税率).doc VIP
- 蟑螂防治_六_不同场所蟑螂的防治.docx VIP
- 人民大2023商务英语视听说(第1册)(第二版)PPTUnit 8 Work and Life.pptx VIP
- 医美皮肤美容产品芙语诺专业知识课件.pdf VIP
- 跨文化交际:中英文化对比 (14).ppt VIP
- 《乳腺癌术后康复锻炼课件》.ppt VIP
- 科研经费管理规定.docx VIP
- 鲁科版四年级上册劳动项目一 清洁与卫生——班级卫生大扫除(课件).pptx VIP
- 2025年秋学期人教版初中数学八年级上册教学计划教学进度表.docx VIP
文档评论(0)