韶山高强灌浆料(Shaoshan high strength grouting material).doc

韶山高强灌浆料(Shaoshan high strength grouting material).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
韶山高强灌浆料(Shaoshan high strength grouting material)

韶山高强灌浆料(Shaoshan high strength grouting material) Jian Lu Hongye 158-2718-4950 manager, Wuhan an-jian Hongye company specializing in the production of high strength grouting material suppliers in Shaoshan Shaoshan CGM grouting material suppliers Shaoshan grouting material manufacturer Shaoshan grouting material and grouting material manufacturers offer Shao mountain strong Shaoshan Shaoshan offer high strength grouting material grouting material factory Shaoshan CGM grouting material is made of high strength material as aggregate, with cement as bonding agent, supplemented by high flow, micro expansion, anti segregation and other substances. It adds a certain amount of water to the construction site and can be used after mixing. The grouting material has the advantages of good gravity, quick hard, early strength, high strength, no shrinkage and slight expansion, no poison, no harm, no aging, no pollution to the water quality and the surrounding environment, self tightness, rust prevention and the like. In construction, it has the advantages of reliable quality, low cost, shortened construction period and convenient operation. To fundamentally change the equipment base force, and the whole load uniformly bear equipment, to meet all kinds of machinery, electrical equipment (heavy equipment and high precision grinder) installation requirements, is the ideal filling material of the pad installation time. Scope of application: Ann Hongye brand CGM grouting material is mainly used for anchor bolt, runway repair, nuclear power equipment fixed, Luqiao engineering reinforcement, machine base, steel structure and foundation with mouth, two times of equipment foundation grouting, buried reinforced concrete structure planting reinforcement and reconstruction of old concrete structure, crack control, electromechanical equipment installation, track and installation of steel structure, static pile engineering piles, the structure of the wall thickening and repair the leakage of va

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档